您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF ECONOMIZER WORN-OUT FOR A 670 t/h BOILER IN ONE POWER PLANT AND RETROFITTING DESIGN THEREOF
更新时间:2025-09-28
    • CAUSE ANALYSIS OF ECONOMIZER WORN-OUT FOR A 670 t/h BOILER IN ONE POWER PLANT AND RETROFITTING DESIGN THEREOF

    • Thermal Power Generation   Issue 4, Pages: 100-101(2007)
    • DOI:10.19666/j.rlfd.2007.04.029    

      CLC: TK223.33
    • Published:2007

    移动端阅览

  • LI Jun, YAN Wei-ping, XING De-shan, et al. CAUSE ANALYSIS OF ECONOMIZER WORN-OUT FOR A 670 t/h BOILER IN ONE POWER PLANT AND RETROFITTING DESIGN THEREOF[J]. Thermal power generation, 2007, (4): 100-101. DOI: 10.19666/j.rlfd.2007.04.029.

  •  
  •  

0

Views

160

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS AND TREATMENT OF SOMEWHAT LOWER MAIN STEAM TEMPERATURE PROBLEM FOR 2045 t/h BOILER
ANALYSIS AND REMEDY OF BURST-LEAKAGE OF "FOUR KINDS OF TUBE" IN BOILERS OF SHIMEN POWER PLANT
ESTABLISHMENT OF SERVICE LIFE MANAGEMENT SYSTEM FOR HIGH-TEMPERATURE BOILER TUBES IN THERMAL POWER PLANT BASED ON B/S STRUCTURE
CAUSE ANALYSIS OF HIGH EXHAUST GAS TEMPERATURE FROM HG-450/13.7-YM24 BOILER AND RETROFIT THEREOF
CAUSE ANALYSIS ABOUT LEAKAGE OF "FOUR TUBE KINDS" IN BOILERS

Related Author

XIANG Chunzheng
GUO Qing-feng
DU Bao-hua
LI Yao-jun
LIU Zhen-yu
LI Chung-min
WANG Zhong-jie
SUN Xi(Xi'an Thermal Power Reseach Institute Co.Ltd

Related Institution

Zhejiang Electric Power Construction Corporation
Shimen Power Plant
Xi'an Thermal Power Research Institute Co., Ltd
Guodian Suqian Thermal Power Co., Ltd
Baoding Electric Power Vocational and Technical College
0