CHEN Sheng-jun1, SHEN Song-lin2, KE Wen-shi1(1.Zhejiang Branch of Huaneng Corporation. TECHNOLOGY OF ADDITIONALLY SUPPLYING STEAM AT OVERLOAD TO ULTRA-SUPERCRITICAL STEAM TURBINE IN HUANENG YUHUAN POWER PLANT[J]. Thermal power generation, 2007, (4): 71-73.
DOI:
CHEN Sheng-jun1, SHEN Song-lin2, KE Wen-shi1(1.Zhejiang Branch of Huaneng Corporation. TECHNOLOGY OF ADDITIONALLY SUPPLYING STEAM AT OVERLOAD TO ULTRA-SUPERCRITICAL STEAM TURBINE IN HUANENG YUHUAN POWER PLANT[J]. Thermal power generation, 2007, (4): 71-73. DOI: 10.19666/j.rlfd.2007.04.019.
TECHNOLOGY OF ADDITIONALLY SUPPLYING STEAM AT OVERLOAD TO ULTRA-SUPERCRITICAL STEAM TURBINE IN HUANENG YUHUAN POWER PLANT
The technology of additionally supplying steam at overload to ultra-supercritical 1000 MW steam turbine in Yuhuan Power Plant has been correspondingly presented.Adopting said technology
the economic behavior of said unit has been greatly enhanced in case without opening the supplementary steam valve below rated operating condition
and having capability of regulating frequency;but the economic behavior of said unit is decreased due to throttle at the time of opening the supplementary steam valve after rated operating condition.