您当前的位置:
首页 >
文章列表页 >
TECHNOLOGY OF ADDITIONALLY SUPPLYING STEAM AT OVERLOAD TO ULTRA-SUPERCRITICAL STEAM TURBINE IN HUANENG YUHUAN POWER PLANT
更新时间:2025-09-28
    • TECHNOLOGY OF ADDITIONALLY SUPPLYING STEAM AT OVERLOAD TO ULTRA-SUPERCRITICAL STEAM TURBINE IN HUANENG YUHUAN POWER PLANT

    • Thermal Power Generation   Issue 4, Pages: 71-73(2007)
    • DOI:10.19666/j.rlfd.2007.04.019    

      CLC: TK267
    • Published:2007

    移动端阅览

  • CHEN Sheng-jun1, SHEN Song-lin2, KE Wen-shi1(1.Zhejiang Branch of Huaneng Corporation. TECHNOLOGY OF ADDITIONALLY SUPPLYING STEAM AT OVERLOAD TO ULTRA-SUPERCRITICAL STEAM TURBINE IN HUANENG YUHUAN POWER PLANT[J]. Thermal power generation, 2007, (4): 71-73. DOI: 10.19666/j.rlfd.2007.04.019.

  •  
  •  

0

Views

295

下载量

13

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Thermal hydrodynamic performance of vertically-upward water wall in an ultra-supercritical double-reheat boiler with high working parameters
Water wall temperature deviation of an ultra-supercritical 1 000 MW unit boiler: analysis and countermeasures
Economy analysis for an ultra supercritical 1 000 MW unit with EC-BEST thermal dynamic system
Analysis and optimization for online operation performance indexes of the ultra supercritical 1 000 MW double-reheat unit in Laiwu Power Plant
Computational analysis on hydrodynamic characteristics and flow instability of an ultra supercritical 1 000 MW double-reheat unit boiler

Related Author

MAO Yijun
HE Lijun
ZHANG Yifan
YANG Yu
BAI Wengang
ZHANG Shihong
LIU Zhengqiang
NIE Xin

Related Institution

Huaneng Anyuan Power Generation Co., Ltd.
Guodian Taizhou Power Generation Co., Ltd.
Xi’an Thermal Power Research Institute Co., Ltd.
国家电投集团河南电力有限公司技术信息中心
国家电投集团河南电力有限公司平顶山发电分公司
0