您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF HIGH-TEMPERATURE CORROSION ON WATER-WALL OF A 440 t/h BOILER
更新时间:2025-09-28
    • CAUSE ANALYSIS OF HIGH-TEMPERATURE CORROSION ON WATER-WALL OF A 440 t/h BOILER

    • Thermal Power Generation   Issue 3, Pages: 45-47(2007)
    • DOI:10.19666/j.rlfd.2007.03.013    

      CLC: TK224.9
    • Published:2007

    移动端阅览

  • SONG Shao-wei1, QIU Xian-tang1, ZHOU Hai-qing1, et al. CAUSE ANALYSIS OF HIGH-TEMPERATURE CORROSION ON WATER-WALL OF A 440 t/h BOILER[J]. Thermal power generation, 2007, (3): 45-47. DOI: 10.19666/j.rlfd.2007.03.013.

  •  
  •  

0

Views

149

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE ANALYSIS AND PREVENTION OF BURST-LEAKAGE FROM "FOUR TUBE KINDS" IN A HOME-MADE 670 t/h BOILER
CAUSE ANALYSIS OF HIGH TEMPERATURE CORROSION OCCURRED ON THE WATER-WALL AND RESOLUTION MEASURES THEREOF
CAUSE ANALYSIS OF SLAGGING IN BABCOCK 2209 t/h BOILERS MADE IN GERMANY AND PREVENTION THEREOF
ESTABLISHMENT OF SERVICE LIFE MANAGEMENT SYSTEM FOR HIGH-TEMPERATURE BOILER TUBES IN THERMAL POWER PLANT BASED ON B/S STRUCTURE
ANTI-WEAR TECHNOLOGY FOR CFB BOILERS

Related Author

ZONG Zhi-wei(Datang Luoyang Shouyangshan Power Plant
ZHANG Guo-bing
LIANG Gui-long
LI Hu
DU Bao-hua
LI Yao-jun
LIU Zhen-yu
LI Chung-min

Related Institution

Datang Luoyang Shouyangshan Power Plant
Hejin Power Plant
Huaneng Dezhou Power Plant
Huaneng Yuhuan Power Plant
Henan Zhongfu Electric Power Co., Ltd
0