您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF FREQUENT BURST-LEAKAGE OCCURRED ON REHEATER AND WATER-WALL OF 300 MW UTILITY BOILER
更新时间:2025-09-28
    • CAUSE ANALYSIS OF FREQUENT BURST-LEAKAGE OCCURRED ON REHEATER AND WATER-WALL OF 300 MW UTILITY BOILER

    • Thermal Power Generation   Issue 3, Pages: 32-34(2007)
    • DOI:10.19666/j.rlfd.2007.03.009    

      CLC: TK223.3
    • Published:2007

    移动端阅览

  • YIN Gang (Xi’an Jiaotong University. CAUSE ANALYSIS OF FREQUENT BURST-LEAKAGE OCCURRED ON REHEATER AND WATER-WALL OF 300 MW UTILITY BOILER[J]. Thermal power generation, 2007, (3): 32-34. DOI: 10.19666/j.rlfd.2007.03.009.

  •  
  •  

0

Views

133

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ESTABLISHMENT OF SERVICE LIFE MANAGEMENT SYSTEM FOR HIGH-TEMPERATURE BOILER TUBES IN THERMAL POWER PLANT BASED ON B/S STRUCTURE
CALCULATION OF WALL-TEMPERATURE FOR SUPERHEATER AND REHEATER OF HG670/13.7-YM13 TYPE BOILER
CAUSE ANALYSIS OF HIGH TEMPERATURE CORROSION OCCURRED ON THE WATER-WALL AND RESOLUTION MEASURES THEREOF
CAUSE ANALYSIS OF SLAGGING IN BABCOCK 2209 t/h BOILERS MADE IN GERMANY AND PREVENTION THEREOF
ANTI-WEAR TECHNOLOGY FOR CFB BOILERS

Related Author

DU Bao-hua
LI Yao-jun
LIU Zhen-yu
LI Chung-min
WANG Zhong-jie
SUN Xi(Xi'an Thermal Power Reseach Institute Co.Ltd
LIU Tong
XU Gang

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
North China Electric Power University
North China Electric Power University Beijing
Hejin Power Plant
0