CAUSE ANALYSIS OF UNSMOOTH BLOCKAGE OCCURRED ON HIGH-PRESSURE MAIN STEAM VALVE OF STEAM TURBINE AND PREVENTIVE MEASURES THEREOF
更新时间:2025-09-28
    • CAUSE ANALYSIS OF UNSMOOTH BLOCKAGE OCCURRED ON HIGH-PRESSURE MAIN STEAM VALVE OF STEAM TURBINE AND PREVENTIVE MEASURES THEREOF

    • Thermal Power Generation   Issue 1, Pages: 99-100(2007)
    • DOI:10.19666/j.rlfd.2007.01.034    

      CLC: TK263
    • Published:2007

    移动端阅览

  • ZHU Qing-yu(Huaneng Dandong Power Plant. CAUSE ANALYSIS OF UNSMOOTH BLOCKAGE OCCURRED ON HIGH-PRESSURE MAIN STEAM VALVE OF STEAM TURBINE AND PREVENTIVE MEASURES THEREOF[J]. Thermal power generation, 2007, (1): 99-100. DOI: 10.19666/j.rlfd.2007.01.034.

  •  
  •  

0

Views

123

下载量

9

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

COMPARISON AND ANALYSIS OF PERFORMANCE FOR DEH HYDRAULIC CONTROL SYSTEM OF 600 MW STEAM TURBINE MANUFACTURED BY TOSHIBA CORPORATION
CAUSE ANALYSIS OF INNER-WALL CRACKING ON HIGH-PRESSURE MAIN STEAM VALVE'S SHELL
SIMPLIFIED FINITEELEMENT CALCULATION MODEL OF TEMPERATURE FIELD FOR STEAM TURBINE ROTOR
APPLICATION OF SOLID SELF-LUBRICATING TECHNOLOGY IN POWER PLANTS
STUDY ON CONTROL SYSTEM SETTING OF DOUBLE EXTRACTION ADJUSTABLE STEAM TURBINE

Related Author

SU Wen-jie
HE Fang(Xi'an Electric Power Higher Proffessional College
CHEN Jue-weiHuaxia International Power Generation Co Ltd
LUO Juan
HU Niansu
QI Haitao
WANG Zhijun
WANG Chenyu

Related Institution

Xi'an electricity College
Huaxia International Power Development Co., Ltd
Wuhan University
Zhangze Power Plant
0