您当前的位置:
首页 >
文章列表页 >
MEASURES FOR ALLEVIATING LEAKAGES OF COPPER TUBES IN CONDENSER
更新时间:2025-09-28
    • MEASURES FOR ALLEVIATING LEAKAGES OF COPPER TUBES IN CONDENSER

    • Thermal Power Generation   Issue 1, Pages: 85-86(2007)
    • DOI:10.19666/j.rlfd.2007.01.027    

      CLC: TK264.11
    • Published:2007

    移动端阅览

  • GAO Jian-ling, ZHANG Guo-ping(Huadian Banshan Power Generation Co Ltd. MEASURES FOR ALLEVIATING LEAKAGES OF COPPER TUBES IN CONDENSER[J]. Thermal power generation, 2007, (1): 85-86. DOI: 10.19666/j.rlfd.2007.01.027.

  •  
  •  

0

Views

61

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

DEVELOPMENT AND APPLICATION OF REMOTE MONITORING SYSTEM FOR CHEMICALS DOSING IN WATER TREATMENT OF POWER PLANTS
RETROFITTING OF AUXILIARY VALVE FOR SOLENOID BLOWOUT VALVES
THE INFLUENCE OF STEAM FLOW FIELD AT CONDENSER'S TUBEBUNDLE INLET UPON EXHAUST PRESSURE OF STEAM TURBINE
OPTIMIZATION OF DEB COORDINATED CONTROL SYSTEM FOR 300 MW UNIT
DESIGN AND ECONOMIC OPERATION OF DOUBLE-SPEED CIRCULATORY WATER PUMP FOR 135 MW INDIRECT AIR-COOLED UNIT

Related Author

XU Ting
YANG Wansheng
LUO Sheng
PENG Xiangyu
WANG Hongtao
WAN Kuifang
HE Tong-xiang
ZHANG Hua-lei

Related Institution

Wuhan University
The Pearl River Power Plant Guangdong
Huazhong Power Grid Co., Ltd
Datang Changshan Thermal Power Plant
0