AN APPROACH TO PROBLEMS MAY EXISTING IN RETROFITTING 300 MW CONDENSING UNIT INTO HEAT-SUPPLYING UNIT IN QINHUANG DAO POWER PLANT
更新时间:2025-09-28
    • AN APPROACH TO PROBLEMS MAY EXISTING IN RETROFITTING 300 MW CONDENSING UNIT INTO HEAT-SUPPLYING UNIT IN QINHUANG DAO POWER PLANT

    • Thermal Power Generation   Issue 1, Pages: 51-53(2007)
    • DOI:10.19666/j.rlfd.2007.01.015    

      CLC: TK263
    • Published:2007

    移动端阅览

  • Lü Hong-ying~1, ZHU Ning~2(1.Chongqing Electric Power Professional College. AN APPROACH TO PROBLEMS MAY EXISTING IN RETROFITTING 300 MW CONDENSING UNIT INTO HEAT-SUPPLYING UNIT IN QINHUANG DAO POWER PLANT[J]. Thermal power generation, 2007, (1): 51-53. DOI: 10.19666/j.rlfd.2007.01.015.

  •  
  •  

0

Views

214

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

大型火力发电机组煤耗分析
ANALYSIS OF ENHANCING THE COMPREHENSIVE BENEFITS FOR LOCAL THERMAL POWER ENTERPRISES
ANALYSIS OF THERMAL ECONOMIC BEHAVIOR FOR ADOPTING COOL-ELETRICITY CO-GENERATION TO 300 MW EXTRACTION CONDENSING UNIT
Economic Analysis on Recycling Waste heat of Auxiliary Equipment Circulating Water in supercritical 660 MW Units
Control optimization strategy for units with reheat steam heating

Related Author

续爱世
付弢
杨杰
夏明
王武林
WANG Yu2 (1.Taiyuan University of Science and Technology
WANG Jin1
FAN Jiang1

Related Institution

山西太原030001
Shanxi Academy of Electric Power Sciences
Shanxi Electric Power Academy
Taizhou Vocational and Technical College, Taizhou Economic Commission, Taizhou, Jiangsu 225300, Taizhou, Jiangsu 225300
Datong Second Power Plant
0