INFLUENCE OF TWO DIFFERENT PROCESSES FOR SHUTTING DOWN STEAM TURBINE UPON ITS OPERATION AND ROTOR-LIFE EXPENDITURE
更新时间:2025-09-28
    • INFLUENCE OF TWO DIFFERENT PROCESSES FOR SHUTTING DOWN STEAM TURBINE UPON ITS OPERATION AND ROTOR-LIFE EXPENDITURE

    • Thermal Power Generation   Issue 1, Pages: 44-46(2007)
    • DOI:10.19666/j.rlfd.2007.01.013    

      CLC: TK267
    • Published:2007

    移动端阅览

  • CHEN Feng, SHENG De-ren, CHEN Jian-hong, et al. INFLUENCE OF TWO DIFFERENT PROCESSES FOR SHUTTING DOWN STEAM TURBINE UPON ITS OPERATION AND ROTOR-LIFE EXPENDITURE[J]. Thermal power generation, 2007, (1): 44-46. DOI: 10.19666/j.rlfd.2007.01.013.

  •  
  •  

0

Views

195

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS OF UNUSUAL TEMPERATURE VARIATION CONCERNING MEDIUM-PRESSURE CYLINDER IN START-UP PROCESS OF 330 MW UNIT MADE BY ROMANIA
CAUSE ANALYSIS OF INNER-WALL CRACKING ON HIGH-PRESSURE MAIN STEAM VALVE'S SHELL
INFLUENCE OF ELASTIC SLOT DEPTH AT THE FOOT OF GOVERNING STAGE UPON THERMAL STRESS OF THE ROTOR
THERMAL COMPENSATION OF FLUE DUCT IN THERMAL POWER PLANT
Operating state and fatigue life evaluation of boiler steam drum for domestic first set of 9F gas turbine units

Related Author

MA Wang-peng
CHEN Jue-weiHuaxia International Power Generation Co Ltd
LIU Wen-hui11.College of Energy and Power Engineering
LI Ming2
CHEN Jian1
YANG Ji-ming1
BAI Yun1
FANG Tao

Related Institution

Huadian Pucheng Power Generation Co., Ltd
Huaxia International Power Development Co., Ltd
Sichuan Energy Conservation Monitoring Center
School of Energy and Power Engineering, Changsha University of Science and Technology
National Nuclear Power Planning and Design Institute
0