您当前的位置:
首页 >
文章列表页 >
ESTABLISHMENT OF SERVICE LIFE MANAGEMENT SYSTEM FOR HIGH-TEMPERATURE BOILER TUBES IN THERMAL POWER PLANT BASED ON B/S STRUCTURE
更新时间:2025-09-28
    • ESTABLISHMENT OF SERVICE LIFE MANAGEMENT SYSTEM FOR HIGH-TEMPERATURE BOILER TUBES IN THERMAL POWER PLANT BASED ON B/S STRUCTURE

    • Thermal Power Generation   Issue 1, Pages: 12-14(2007)
    • DOI:10.19666/j.rlfd.2007.01.004    

      CLC: TK223.3
    • Published:2007

    移动端阅览

  • DU Bao-hua, LI Yao-jun, LIU Zhen-yu, et al. ESTABLISHMENT OF SERVICE LIFE MANAGEMENT SYSTEM FOR HIGH-TEMPERATURE BOILER TUBES IN THERMAL POWER PLANT BASED ON B/S STRUCTURE[J]. Thermal power generation, 2007, (1): 12-14. DOI: 10.19666/j.rlfd.2007.01.004.

  •  
  •  

0

Views

149

下载量

11

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CALCULATION OF WALL-TEMPERATURE FOR SUPERHEATER AND REHEATER OF HG670/13.7-YM13 TYPE BOILER
ANALYSIS AND TREATMENT OF SOMEWHAT LOWER MAIN STEAM TEMPERATURE PROBLEM FOR 2045 t/h BOILER
CAUSE ANALYSIS OF FREQUENT BURST-LEAKAGE OCCURRED ON REHEATER AND WATER-WALL OF 300 MW UTILITY BOILER
CAUSE ANALYSIS OF HIGH EXHAUST GAS TEMPERATURE FROM HG-450/13.7-YM24 BOILER AND RETROFIT THEREOF
ON-LINE MONITORING OF TUBE-WALL TEMPERATURE FOR SUPERHEATER AND REHEATER IN FURNACE OF SUPER CRITICAL BOILERS

Related Author

LIU Tong
XU Gang
XIANG Chunzheng
YIN Gang (Xi’an Jiaotong University
ZHOU Bao-shan
ZHU Xiao-shui
CHEN Peng
DONG Gang

Related Institution

North China Electric Power University
North China Electric Power University Beijing
Zhejiang Electric Power Construction Corporation
Huadian Pucheng Power Plant
0