您当前的位置:
首页 >
文章列表页 >
PRESENTATION OF BOILER USED STEELS FOR 4×1000mw ULTRA-SUPERCRITICAL UNITS IN HUANENG YUHUAN POWER PLANT
更新时间:2025-09-28
    • PRESENTATION OF BOILER USED STEELS FOR 4×1000mw ULTRA-SUPERCRITICAL UNITS IN HUANENG YUHUAN POWER PLANT

    • Thermal Power Generation   Issue 12, Pages: 78-79(2006)
    • DOI:10.19666/j.rlfd.2006.12.028    

      CLC: TK229.2
    • Published:2006

    移动端阅览

  • SHAO Tian-you, LI Fa-zhong, HAN Ke-gang. PRESENTATION OF BOILER USED STEELS FOR 4×1000mw ULTRA-SUPERCRITICAL UNITS IN HUANENG YUHUAN POWER PLANT[J]. Thermal power generation, 2006, (12): 78-79. DOI: 10.19666/j.rlfd.2006.12.028.

  •  
  •  

0

Views

386

下载量

19

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on main and reheat steam temperature lifting method for ultra supercritical 1 000 MW unit double-tangential circular boiler
Analysis on mechanism and economic benefit of a new type of steam pulsed acoustic dust cleaning device
Intelligent gas soot blowing for convective heat exchanger in tail section of boiler
Arrangement optimization for temperature measuring points on tube wall of (ultra) supercritical boilers
Experimental study on optimization and adjustment of wall temperature of reheater tubes in an ultra supercritical double-reheat boiler

Related Author

LU Jingni
TU Shan
ZHUO Minpeng
HONG Zhenhan
ZHANG Yi
CHEN Dongsheng
WANG Long
QIU Shenjie

Related Institution

西安远能新能源科技有限公司
School of Automation,Northeast Dianli University
Shenhua Guohua Electric Power Research Institute Company Limitied
Xi’an Thermal Power Research Institute Co., Ltd., Suzhou Branch
Technical Information Center,Henan Electric Power Co.,Ltd.
0