    • ANALYSIS OF TROUBLES OCCURRED IN OPERATION OF HIGH-PRESSURE HEATER AND RETROFIT THEREOF

    • Thermal Power Generation   Issue 12, Pages: 39-40(2006)
    • DOI:10.19666/j.rlfd.2006.12.013    

      CLC: TK268
    • Published:2006

    移动端阅览

  • CHEN Gong. ANALYSIS OF TROUBLES OCCURRED IN OPERATION OF HIGH-PRESSURE HEATER AND RETROFIT THEREOF[J]. Thermal power generation, 2006, (12): 39-40. DOI: 10.19666/j.rlfd.2006.12.013.

  •  
  •  

0

Views

153

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

A TENTATIVE IDEA FOR ENHANCING THE HIGI-PRESSURE HEATER'S RELIABILITY OF LARGE-SCALE UNITS
FAILURE ANALYSIS FOR HIGH-PRESSURE HEATER OF 200 MW STEAM-TURBINE UNITS IN ONE THERMAL POWER PLANT
STATIC EMULATING CALCULATING AND FAULT FEATURE ANALYSIS FOR HIGHPRESSURE HEATER LEAKAGE
IMPROVEMENT OF LEAKAGE-PLUGGING TECHNOLOGY ON TUBE-PLATE OF HIGH-PRESSURE HEATER
Thermal fatigue failure analysis for drainage-tank in hot section of reheat pipeline in an ultra supercritical 1 000 MW unit

Related Author

周兰欣
张明智
杨祥良
李守伦
姚雅秋
谢诞梅
袁野
郭明万

Related Institution

Jiaozuo Power Plant
Rizhao Power Plant
North China Electric Power University
Wuhan University
0