您当前的位置:
首页 >
文章列表页 >
DIAGNOSIS FOR VIBRATION TROUBLE OF TURBO-GENERATOR SET IN START-UP PROCESS AND REMEDIAL MEASURES THEREOF
更新时间:2025-09-28
    • DIAGNOSIS FOR VIBRATION TROUBLE OF TURBO-GENERATOR SET IN START-UP PROCESS AND REMEDIAL MEASURES THEREOF

    • Thermal Power Generation   Issue 11, Pages: 37-41(2006)
    • DOI:10.19666/j.rlfd.2006.11.013    

      CLC: TK268
    • Published:2006

    移动端阅览

  • DIAGNOSIS FOR VIBRATION TROUBLE OF TURBO-GENERATOR SET IN START-UP PROCESS AND REMEDIAL MEASURES THEREOF[J]. Thermal power generation, 2006, (11): 37-41. DOI: 10.19666/j.rlfd.2006.11.013.

  •  
  •  

0

Views

164

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE ANALYSIS OF CRACKS OCCURRED ON LAST STAGE IMPELLER AND DIAPHRAGM OF C12-3.43/0.981 TYPE STEAM TURBINE
DIAGNOSIS AND ANALYSIS OF VIBRATION TROUBLE FOR STEAM TURBINES
ANALYSIS OF RUBBING VIBRATION CAUSED BY BEARING OIL CARBONIZATION OF HIGH AND MEDIUM PRESSURE ROTORS IN THE STEAM TURBINE
LADDER-SHAPED BENDING ANALYSIS AND ELIMINATION FOR A ROTOR UNDER HIGH PRESSURE
ANALYSIS AND DISPOSAL OF VIBRATION ON ULTRA-SUPERCRITICAL TURBO-GENERATOR SET

Related Author

杨福
徐兴林
李益民
姚兵印
DONG Yan - chun
YANG Lin
ZHENG Yun
XU Qian-yi31.Shaanxi Electric Power Science Research Institute

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Hegang Power Generation Co., Ltd
Huaneng Hegang Power Generation Co., Ltd.
China Resources Power Dengfeng Co., Ltd
0