您当前的位置:
首页 >
文章列表页 >
OPTIMIZATION RETROFIT OF LOW-PRESSURE CYLINDER'S EXHAUST STEAM PASSAGE FOR 300 MW STEAM TURBINE
更新时间:2025-09-28
    • OPTIMIZATION RETROFIT OF LOW-PRESSURE CYLINDER'S EXHAUST STEAM PASSAGE FOR 300 MW STEAM TURBINE

    • Thermal Power Generation   Issue 11, Pages: 35-36(2006)
    • DOI:10.19666/j.rlfd.2006.11.012    

      CLC: TK263.1
    • Published:2006

    移动端阅览

  • OPTIMIZATION RETROFIT OF LOW-PRESSURE CYLINDER'S EXHAUST STEAM PASSAGE FOR 300 MW STEAM TURBINE[J]. Thermal power generation, 2006, (11): 35-36. DOI: 10.19666/j.rlfd.2006.11.012.

  •  
  •  

0

Views

166

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS OF TECHNICAL RETROFIT FOR TURBINE NO7 IN GUODIAN JIANBI POWER PLANT
EXPERIENCE OF LEAKAGE SHOOTING BY ISOLATING HALF CONDENSER IN OPERATION OF THE 300 MW STEAM TURBINE
Optimization and analysis of cold-end system in thermal power units
A mathematical online diagnosis model for air-leakage of condenser
Discussions on tube bundle arrangement factor for condensers in steam turbines

Related Author

丁铭
雍伟林
贾仰生
MA Shanjun
LI Shaohua
ZHANG Li
ZENG Zhendong
CHENG Haoran

Related Institution

Shanghai Jiao Tong University
Guodian Jianbi Power Plant
Huadian Zouxian Power Plant
North China Electric Power University
College of Energy and Mechanical Engineering, Shanghai University of Electric Power
0