APPLICATION OF TECHNOLOGY FOR CHANGING 410 t/h OIL-FIRED BOILER TO BURN COAL-WATER SLURRY IN MAOMING THERMAL POWER PLANT
更新时间:2025-09-28
    • APPLICATION OF TECHNOLOGY FOR CHANGING 410 t/h OIL-FIRED BOILER TO BURN COAL-WATER SLURRY IN MAOMING THERMAL POWER PLANT

    • Thermal Power Generation   Issue 11, Pages: 26-28(2006)
    • DOI:10.19666/j.rlfd.2006.11.009    

      CLC: TK227.1
    • Published:2006

    移动端阅览

  • JIE Zhao. APPLICATION OF TECHNOLOGY FOR CHANGING 410 t/h OIL-FIRED BOILER TO BURN COAL-WATER SLURRY IN MAOMING THERMAL POWER PLANT[J]. Thermal power generation, 2006, (11): 26-28. DOI: 10.19666/j.rlfd.2006.11.009.

  •  
  •  

0

Views

92

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

A NEW METHOD FOR DETERMINING THE CRITICAL SHEAR RATE IN RHEDLOGICAL MODEL OF COAL-WATER SLURRY
INFLUENCE OF INCIDENCE ANGLE CHANGE IN GASIFICATION NOZZLE UPON FLOW FIELD AND CONCENTRATION FIELD IN THE FURNACE
INFLUENCE OF LOAD VARIATION CONCERNING TWO-STAGE COAL-WATER SLURRY GASIFIER UPON PERFORMANCE OF THE IGCC SYSTEM

Related Author

ZHAO Guo-hua
DUAN Yu-fengSouth-east China University
ZHOU Zhijun
HU Yingchao
YANG Jian
ZHOU Junhu
LIU Jianzhong
CEN Kefa State-level Key Laboratory of Clean Energy Utilization

Related Institution

Southeast University
State Key Laboratory of Clean Energy Utilization, Zhejiang University
Zehjiang Universlty
College of Energy Science and Engineering, Harbin Institute of Technology
National Power Plant Combustion Engineering Technology Research Center
0