您当前的位置:
首页 >
文章列表页 >
RESEARCH AND DEVELOPMENT OF OPERATION OPTIMIZING SYSTEM FOR CFB BOILERS
更新时间:2025-09-28
    • RESEARCH AND DEVELOPMENT OF OPERATION OPTIMIZING SYSTEM FOR CFB BOILERS

    • Thermal Power Generation   Issue 11, Pages: 1-3(2006)
    • DOI:10.19666/j.rlfd.2006.11.001    

      CLC: TK229.6
    • Published:2006

    移动端阅览

  • RESEARCH AND DEVELOPMENT OF OPERATION OPTIMIZING SYSTEM FOR CFB BOILERS[J]. Thermal power generation, 2006, (11): 1-3. DOI: 10.19666/j.rlfd.2006.11.001.

  •  
  •  

0

Views

192

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Intelligent combustion control model for utility boilers based on asymmetric artificial neural networks
Economic research on desulfurization and denitration for a supercritical 350 MW circulating fluidized bed boiler
A STUDY OF OPERATIONAL PERFORMANCE FOR CFB BOILERS
EXPERTMENTAL STUDY ON GAS-SOLID TWO-PHASE FLOW WITH STRONGLY SWIRLING TURBULENCE
DESIGN OF GENERAL PROGRAM FOR THERMAL PERFORMANCE CALCULATGION CONCERNING CFB BOILERS BASEO ON VF

Related Author

WU Hengyun
GAO Lin
TIAN Jianyong
ZHOU Junbo
GAO Haidong
WANG Lin
WANG Mingkun
ZHANG Jiansheng

Related Institution

Kaifeng Power Generation Branch, National Electric Power Group Henan Electric Power Co., Ltd.
Xi’an Thermal Power Research Institute Co., Ltd.
Shenhua Guoneng (Shendong Power) Group
Huazhong University of Science and Technology
0