您当前的位置:
首页 >
文章列表页 >
DEBUGGING OF DEH GOVERNING SYSTEM FOR 600 MW SUPERCRITICAL UNIT IN HUANENG QINBEI POWER PLANT AND CONTROL IMPROVEMENT
更新时间:2025-09-28
    • DEBUGGING OF DEH GOVERNING SYSTEM FOR 600 MW SUPERCRITICAL UNIT IN HUANENG QINBEI POWER PLANT AND CONTROL IMPROVEMENT

    • Thermal Power Generation   Issue 9, Pages: 40-43(2006)
    • DOI:10.19666/j.rlfd.2006.09.014    

      CLC: TK323
    • Published:2006

    移动端阅览

  • DEBUGGING OF DEH GOVERNING SYSTEM FOR 600 MW SUPERCRITICAL UNIT IN HUANENG QINBEI POWER PLANT AND CONTROL IMPROVEMENT[J]. Thermal power generation, 2006, (9): 40-43. DOI: 10.19666/j.rlfd.2006.09.014.

  •  
  •  

0

Views

192

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE ANALYSIS OF HIGHER MAIN STEAM TEMPERATURE DURING ROTATION-IMPULSING TO START UP 600 MW SUPERCRITICAL UNIT AND ADOPTED MEASURES
Fieldbus commissioning method and problem handling for coal-fired power plants
APPLICATION OF APS ONTO GAS-STEAM COMBINED CYCLE UNITS
APPLICATION OF FUZZY CONTROL IN RETARTED CONTROL SYSTEM WITH BIG TIME-DELAY AT POWER PLANTS
ANALYSIS OF RELIABILITY-ENHANCING IN START-UP COMMISSIONING OF A COMPLETE HOME-MADE 125MW TURBO-GENERATOR SET

Related Author

黄伟
TAN Xiangshuai
CHEN Kun
GAO Kui
LIANG Zhao
WU Heng-yun
ZHANG Xiao-bang
YAN Xu-yan

Related Institution

Hunan Electric Power Test and Research Institute
Xi'an Thermal Power Research Institute Co.,Ltd.
Zhejiang University
Guangdong Electric Power Test and Research Institute
0