ANALYSIS OF SERVOMOTOR AND OILPIPE VIBRATION FOR CN635/9 STEAM TURBINE, AS WELL AS REMEDY THEREOF
更新时间:2025-09-28
    • ANALYSIS OF SERVOMOTOR AND OILPIPE VIBRATION FOR CN635/9 STEAM TURBINE, AS WELL AS REMEDY THEREOF

    • Thermal Power Generation   Issue 9, Pages: 35-36(2006)
    • DOI:10.19666/j.rlfd.2006.09.012    

      CLC: TK268.1
    • Published:2006

    移动端阅览

  • YANG Genshan. ANALYSIS OF SERVOMOTOR AND OILPIPE VIBRATION FOR CN635/9 STEAM TURBINE, AS WELL AS REMEDY THEREOF[J]. Thermal power generation, 2006, (9): 35-36. DOI: 10.19666/j.rlfd.2006.09.012.

  •  
  •  

0

Views

90

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE ANALYSIS OF VIBRATION ON UNIT NO.1 IN ZHANJIANG POWER PLANT AND TREATMENT THEREOF
ENERGYSAVING AND CAPACITYINCREASING RETROFIT OF STEAM TURBINE FOR 100 MW UNIT IN HUAYINSHAN POWER PLANT
FIELD TEST OF PARAMETERS THROUGH THE STEAM TURBINE AND ITS GOVENOR SYSTEM MODEL
GREY THEORY BASED VIBRATION PREDICTION FOR STEAM TURBINES
Checking based measuring methods for parameters of steam turbine and its governing systems

Related Author

WU Guowei
ZHU Yun
XU Gao-shan
GONG Xue-liJiangxi Provincial Electric Power Research Institute
LIANG Lei1
SU Leitao2
FENG Yongxin2
JIANG Dongxiang1 1.State Key Laboratory of Control and Simulation of Power System and Generation Equipment

Related Institution

Zhanjiang Power Plant
Guodian Huayingshan Power Plant
Jiangxi Electric Power Science Research Institute
State Key Laboratory of Power System and Generation Equipment Control and Simulation, Tsinghua University
Guangdong Power Grid Corporation Electric Power Science Research Institute
0