您当前的位置:
首页 >
文章列表页 >
JUDGEMENT METHOD OF IMPACTRUBBING TROUBLE IN STARTUP PROCESS OF 135 MW UNIT AND REMEDIAL MEASURES THEREOF
更新时间:2025-09-28
    • JUDGEMENT METHOD OF IMPACTRUBBING TROUBLE IN STARTUP PROCESS OF 135 MW UNIT AND REMEDIAL MEASURES THEREOF

    • Thermal Power Generation   Issue 9, Pages: 33-34(2006)
    • DOI:10.19666/j.rlfd.2006.09.011    

      CLC: TM621.5
    • Published:2006

    移动端阅览

  • WU Weiji. JUDGEMENT METHOD OF IMPACTRUBBING TROUBLE IN STARTUP PROCESS OF 135 MW UNIT AND REMEDIAL MEASURES THEREOF[J]. Thermal power generation, 2006, (9): 33-34. DOI: 10.19666/j.rlfd.2006.09.011.

  •  
  •  

0

Views

51

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE ANALYSIS AND TREATMENT OF IMPACT-RUBBING BETWEEN MOVABLE AND STATIONARY PARTS OF STEAM TURBINES
ACCIDENT ANALYSIS AND SOLVING MEASURES FOR 135MW STEAM TURBINES RUNNING IN AN ISOLATED ISLAND
NUMERICAL SIMULATION FOR WET STEAM IN EXHAUSTED STEAM PIPELINE OF THE DIRECT AIR COOLING SYSTEM
CAUSE ANALYSIS OF HIGH EXHAUST STEAM PARAMETERS FROM HIGH-PRESSURE CYLINDER OF HOME-MADE 135 MW STEAM TURBINE
ANALYSIS OF VIBRATION INDUCED FROM BREAKAGE OF EXTRACTION STEAM PIPELINE FOR A 300MW STEAM TURBINE UNIT

Related Author

WANG Wen-ying (Hebei Electric Power Research Institute
LU Sheng-yang
MU Fa-hai
WANG Lu-kui Zhoukou Longda Power Generation Co Ltd
YAN Guang-hua
DAI Guo-chao
LIU Hai-feng2
CHEN Jun-li21.Beijing Jiaotong University

Related Institution

Hebei Electric Power Research Institute
Zhoukou Longda Power Generation Co., Ltd
Beijing Jiaotong University
China Huadian Engineering (Group) Co., Ltd
Guodian Suqian Thermal Power Co., Ltd
0