您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF JAMMING AND AIR LEAKAGE OF THE HOT-AIR DAMPER AND RETROFIT THEREOF
更新时间:2025-09-28
    • CAUSE ANALYSIS OF JAMMING AND AIR LEAKAGE OF THE HOT-AIR DAMPER AND RETROFIT THEREOF

    • Thermal Power Generation   Issue 8, Pages: 65-66(2006)
    • DOI:10.19666/j.rlfd.2006.08.023    

      CLC: TM621.2
    • Published:2006

    移动端阅览

  • AN Xue-zhong, XIE Wen-jun, YIE Feng. CAUSE ANALYSIS OF JAMMING AND AIR LEAKAGE OF THE HOT-AIR DAMPER AND RETROFIT THEREOF[J]. Thermal power generation, 2006, (8): 65-66. DOI: 10.19666/j.rlfd.2006.08.023.

  •  
  •  

0

Views

47

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

APPLICATION OF DUAL-SEALING TECHNOLOGY IN RETROFITTING SEAL OF ROTARY AIR PREHEA TERS
RETROFIT OF COARSE AND FINE PULVERIZED COAL SEPARATOR FOR BOILER NO. 1
ANALYSIS OF PRIMARY ADJUSTMENT FOR COMBUSTION-ORIENTED AIR DISTRIBUTION SYSTEM OF SUPERCRITICAL ONCE-THROUGH BOILERS
CAUSE ANALYSIS AND PREVENTIVE MEASURES OF OUTFIRE IN W-SHAPED FLAME BOILER FOR 600 MW UNIT
SIMULATION AND ANALYSIS ABOUT WORN-OUT ON CONNECTING PIPE OF LOW-PRESSURE REHEATER FOR A BOILER OF 600 MW UNIT

Related Author

LIU Gui-feng
SUN Jian-bo
TIAN Guang-zhi
WU Bi-jun1
XU Yao2(1.Zhejiang Provincial Thermal Power Construction Company
WANG Xi-huan
XIA Xiao-dong
ZHOU Zi-minDatang Huayin Jinzhushan Thermal Power Generation Branch Company

Related Institution

Huaibei Guoan Electric Power Co., Ltd
Beijing Huanengda Electric Power Technology Application Co., Ltd.
Guangzhou Power Plant
Zhejiang Thermal Power Construction Company
0