您当前的位置:
首页 >
文章列表页 >
DESIGN AND TEST OF RB CONTROL FOR 300 MW UNITS
更新时间:2025-09-28
    • DESIGN AND TEST OF RB CONTROL FOR 300 MW UNITS

    • Thermal Power Generation   Issue 8, Pages: 42-44(2006)
    • DOI:10.19666/j.rlfd.2006.08.014    

      CLC: TM621.3
    • Published:2006

    移动端阅览

  • QU Guang-hao, LIU Shu-jie. DESIGN AND TEST OF RB CONTROL FOR 300 MW UNITS[J]. Thermal power generation, 2006, (8): 42-44. DOI: 10.19666/j.rlfd.2006.08.014.

  •  
  •  

0

Views

95

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Control strategy for automatic parallel operation of feed water pumps in a 630 MW coal-fired unit
STUDY ON TRIAL OPERATION OF THE POWER-GENERATING UNIT WITHOUT MOTER-DRIVEN FEED-WATER PUMP BY USING THAT OF THE NEIGHBOURING UNIT
Analysis and optimization on run back control strategy for unit with CFB boiler
Economic analysis on several operation schemes for steam-driven feedwater pump group during unit cold starting
Optimization of flue duct for a 600 MW thermal power unit

Related Author

WANG Xihui
CHEN Houtao
PENG Shuangjian
FU Qiang
XUN Xin
MA Xiaolong1
MENG Yingqi1
ZHONG Mingcai2

Related Institution

State Grid Hunan Electric Power Company Research Institute
Hunan Xiangdian Test and Research Institute Co. Ltd.
Hunan Province Key Laboratory of High Efficiency and Clean Thermal Power Technology
Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Jinggangshan Power Plant
0