您当前的位置:
首页 >
文章列表页 >
RETROFIT OF 600 m3/h MECHANICALLY AGITATED SETTLING POND IN BAOJI POWER PLANT NO. 2
更新时间:2025-09-28
    • RETROFIT OF 600 m3/h MECHANICALLY AGITATED SETTLING POND IN BAOJI POWER PLANT NO. 2

    • Thermal Power Generation   Issue 7, Pages: 66-67(2006)
    • DOI:10.19666/j.rlfd.2006.07.022    

      CLC: TM621
    • Published:2006

    移动端阅览

  • RETROFIT OF 600 m3/h MECHANICALLY AGITATED SETTLING POND IN BAOJI POWER PLANT NO. 2[J]. Thermal power generation, 2006, (7): 66-67. DOI: 10.19666/j.rlfd.2006.07.022.

  •  
  •  

0

Views

119

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

TEST STUDY ON THE CALCULATION METHOD OF ENRICHMENT FACTOR FOR CIRCULATORY COOLING WATER
APPLICATION OF NANOMETRIC TECHNOLOGY IN CIRCULATING WATER SYSTEM OF POWER PLANTS
RETROFIT OF DOSING SYSTEM FOR SETTLING POND AT WAIGAOQIAO POWER PLANT
国产100MW机组综合节能改造
AN APPROACH TO ENERGY PRICE ANALYSIS AND ENERGY-SAVING MEASURES IN POWER PLANTS

Related Author

ZHANG Guang-wen Beijing Guohua Electric Power Technique Research Center Co.
YANG Wen-zheng
DING Chang-fu
DING Zhen-yu
HOU Nai-ming College of Energy and Power Engineering
赵林峰
王峰
涂丰盛

Related Institution

Beijing Guohua Electric Power Technology Research Center Co., Ltd
College of Energy and Power Engineering, North China Electric Power University
Suzhou Thermal Power Research Institute
Shanghai Waigaoqiao Power Plant
0