TEST AND ANALYSIS OF BEARING FAILURE FOR 362.5 MW TURBO - GENERATOR SET
更新时间:2025-09-28
    • TEST AND ANALYSIS OF BEARING FAILURE FOR 362.5 MW TURBO - GENERATOR SET

    • Thermal Power Generation   Issue 7, Pages: 50-51(2006)
    • DOI:10.19666/j.rlfd.2006.07.016    

      CLC: TM311
    • Published:2006

    移动端阅览

  • LIU Yong-hui. TEST AND ANALYSIS OF BEARING FAILURE FOR 362.5 MW TURBO - GENERATOR SET[J]. Thermal power generation, 2006, (7): 50-51. DOI: 10.19666/j.rlfd.2006.07.016.

  •  
  •  

0

Views

63

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

NOISE CONTROL OF DIESEL GENERATOR SETS
CAUSE ANALYSIS OF FURNACE WALL VIBRATION FOR UTILITY BOILERS
ANALYSIS OF ABNORMAL SHAFT VIBRATION FOR BEARINGS NO 2 AND 3 ON HOMEMADE 200 MW STEAM TURBINE, AS WELL AS TREATMENT THEREOF
THE ON-LINE VIBRATION MONITORING AND MANAGEMENT SYSTEM OF COMBINED CYCLE UNIT
RAPID DYNAMIC BALANCING OF SHAFTING FOR UNIT NO.2 IN THE FIELD OF HUANENG HEGANG POWERGENERATION COMPANY

Related Author

WANG Shuxin
MAO Shanyong
HUANG Xinghua
DAN Hui-jie
LIU Jia-yu
WANG Ken
YAO Jun
JIN Jianrong

Related Institution

Zhenjiang Shipyard College
Zhenjiang Shipbuilding Institute
Guodian Thermal Power Research Institute
Chongqing Power Plant Chongqing
0