CHEN Hao. EXPERIENCE DEALING WITH THE FAST CUT BACK OF 600MW SUPECRITICAL UNITS[J]. Thermal power generation, 2006, (6): 62-63.
DOI:
CHEN Hao. EXPERIENCE DEALING WITH THE FAST CUT BACK OF 600MW SUPECRITICAL UNITS[J]. Thermal power generation, 2006, (6): 62-63. DOI: 10.19666/j.rlfd.2006.06.022.
EXPERIENCE DEALING WITH THE FAST CUT BACK OF 600MW SUPECRITICAL UNITS
摘要
介绍了华能上海石洞口第二发电厂两台600 MW超临界机组快速甩负荷(FCB)的基本功能
并对历年FCB的情况进行了分析和总结
提出了成功实现FCB的要领。
Abstract
The basic functions of the fast cut back(FCB) for two 600 MW supercritical units in Huaneng Shang hai Shidongkou Power Plant No.2 have been presented
as well as analysis and summation of the FCB situation over the years being carried out
putting forward the essentials for successfully realizing FCB.