您当前的位置:
首页 >
文章列表页 >
EXPERIENCE DEALING WITH THE FAST CUT BACK OF 600MW SUPECRITICAL UNITS
更新时间:2025-09-28
    • EXPERIENCE DEALING WITH THE FAST CUT BACK OF 600MW SUPECRITICAL UNITS

    • Thermal Power Generation   Issue 6, Pages: 62-63(2006)
    • DOI:10.19666/j.rlfd.2006.06.022    

      CLC: TM621.3
    • Published:2006

    移动端阅览

  • CHEN Hao. EXPERIENCE DEALING WITH THE FAST CUT BACK OF 600MW SUPECRITICAL UNITS[J]. Thermal power generation, 2006, (6): 62-63. DOI: 10.19666/j.rlfd.2006.06.022.

  •  
  •  

0

Views

256

下载量

22

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS ABOUT FCB FUNCTION OF 350MW UNIT MANUFACTURED BY MITSUBISHI CORPORATION
PRACTICE OF CHANGING FEED-WATER TREATMENT MODE FOR 300 MW UNIT IN HEZE POWER PLANT FROM AVT(R) INTO AVT(O)
CAUSES LEADING TO ABNORMALITY IN MEASUREMENT USING DRUM-LEVEL GAUGE IN ZHUNGE’R POWER PLANT
ANALYSIS OF TURBINE-BOILER COORDINATED CONTROL AND AGC SYSTEM IN YANGLUO POWER PLANT
CAUSE ANALYSIS OF CORROSION FOR CHEMICAL-DOSING TUBE ENTERING INTO THE DRUM PORT

Related Author

LI Jun-minDepartment of Hai'yang Nuclear Power Project under Zhongdiantou Electric Power Engineering Co Ltd
LI Xiu-juan Heze Power Plant
CHANG Shi-ji
CHEN Min
LI De-shi
WANG Zhen
ZHANG Cuihong
LIU Qiang

Related Institution

Haiyang Nuclear Power Project Department of China Power Investment Corporation Power Engineering Co., Ltd
Heze Power Plant
Zhungeer Power Plant Hohhot
Huaneng Yangluo Power Plant
0