您当前的位置:
首页 >
文章列表页 >
EVALUATION OF SERVICE LIFE CONCERNING HEATING SURFACE OF BOILER NO.1 IN HUANENG HUAIYIN POWER PLANT
更新时间:2025-09-28
    • EVALUATION OF SERVICE LIFE CONCERNING HEATING SURFACE OF BOILER NO.1 IN HUANENG HUAIYIN POWER PLANT

    • Thermal Power Generation   Issue 6, Pages: 20-23(2006)
    • DOI:10.19666/j.rlfd.2006.06.006    

      CLC: TM621.3
    • Published:2006

    移动端阅览

  • ZHU Jianhua. EVALUATION OF SERVICE LIFE CONCERNING HEATING SURFACE OF BOILER NO.1 IN HUANENG HUAIYIN POWER PLANT[J]. Thermal power generation, 2006, (6): 20-23. DOI: 10.19666/j.rlfd.2006.06.006.

  •  
  •  

0

Views

72

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

SERVICE LIFE EVALUATION FOR HIGH TEMPERATURE PIPELINE IN POWER PLANTS BASED ON DAMAGE MECHAINCS
CAUSE ANALYSIS OF TUBE-BURST ON PLATEN SUPERHEATER
Anti-balancing efficiency and its uncertainty analysis of boiler burning mixed coal according to ASME and GB standard

Related Author

CUI Chao-ying
ZHU Jing-song
YANG Jian-hua
ZHANG Xiao-yu1
YANG Jian-ju1
OUYANG Jie1
ZHAO Su-fen21.Hebei Provincial Electric Power Research Institute
HUA Xiaoyu

Related Institution

Zhengzhou Electric Power Vocational College, Zhengzhou Electric Power Vocational College, Zhengzhou Electric Power Vocational College Henan Zhengzhou 450004, Zhengzhou 450004
Hebei Electric Power Research Institute
Huadian Shijiazhuang Thermal Power Co., Ltd
Zhejiang Zhejiang Energy Technology Research Institute Co., Ltd
College of Energy, Power and Mechanical Engineering, North China Electric Power University
0