TLI Jin. DESIGN OF CONTROL SYSTEMS FOR 440 t/h CFB BOILERS IN YUELIAN POWER PLAN[J]. Thermal power generation, 2006, (4): 48-49.
DOI:
TLI Jin. DESIGN OF CONTROL SYSTEMS FOR 440 t/h CFB BOILERS IN YUELIAN POWER PLAN[J]. Thermal power generation, 2006, (4): 48-49. DOI: 10.19666/j.rlfd.2006.04.017.
DESIGN OF CONTROL SYSTEMS FOR 440 t/h CFB BOILERS IN YUELIAN POWER PLAN
摘要
结合粤连发电厂135MW机组循环流化床(CFB)锅炉DCS工程应用实例
对CFB锅炉燃料、风量和床压控制系统的设计进行了详细介绍。
Abstract
Combining with practical project example of applying distributed control system (DCS) for circulating fluidized bed (CFB) boilers of 135 MW units in Yuelian Power Plant
the design of control systems for fuel
air flow rate
and bed pressure of the CFB boilers has been described in detail.
DCS SYSTEM AND CONTROL SCHEME OF CFB BOILER FOR 135MW UNIT IN SHENHUA EVIRONMENT PROTECTION DEMONSTRATING POWER PLANT
ANALYSIS OF FAULTS OCCURRED IN SYNCHRONIZATION WITH POWER NETWORK FOR TAKING INITIAL LOAD BY STEAM TURBINE OF A 180MW GAS AND STEAM TURBINE COMBINED CYCLE UNIT
CAUSE ANALYSIS OF PRIMARY FAN VIBRATION FOR A 130 t/h CFB BOILER
OPERATION PRACTICE OF BURNING ANTRACITIC COAL IN FUJIAN PROVINCE FOR 440 t/h CFB BOILER
CORRECTION METHOD OF OUTGOING GAS TEMPERATURE IN PERFORMANCE TEST OF CFB BOILERS
Related Author
YIN Ji hu
HU Song
YAN Zhaoping
YOU Wenjie
ZHAO Hongyan
SU Jian-min(Longyan Power Generation Co Ltd
XIAO PingXi'an Thermal Power Research Institute Co Ltd
JIANG Min-hua
Related Institution
Shenhuo Group Environmental Protection Demonstration Power Station, Yongcheng