您当前的位置:
首页 >
文章列表页 >
DESIGN OF CONTROL SYSTEMS FOR 440 t/h CFB BOILERS IN YUELIAN POWER PLAN
更新时间:2025-09-28
    • DESIGN OF CONTROL SYSTEMS FOR 440 t/h CFB BOILERS IN YUELIAN POWER PLAN

    • Thermal Power Generation   Issue 4, Pages: 48-49(2006)
    • DOI:10.19666/j.rlfd.2006.04.017    

      CLC: TM621.2
    • Published:2006

    移动端阅览

  • TLI Jin. DESIGN OF CONTROL SYSTEMS FOR 440 t/h CFB BOILERS IN YUELIAN POWER PLAN[J]. Thermal power generation, 2006, (4): 48-49. DOI: 10.19666/j.rlfd.2006.04.017.

  •  
  •  

0

Views

101

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

DCS SYSTEM AND CONTROL SCHEME OF CFB BOILER FOR 135MW UNIT IN SHENHUA EVIRONMENT PROTECTION DEMONSTRATING POWER PLANT
ANALYSIS OF FAULTS OCCURRED IN SYNCHRONIZATION WITH POWER NETWORK FOR TAKING INITIAL LOAD BY STEAM TURBINE OF A 180MW GAS AND STEAM TURBINE COMBINED CYCLE UNIT
CAUSE ANALYSIS OF PRIMARY FAN VIBRATION FOR A 130 t/h CFB BOILER
OPERATION PRACTICE OF BURNING ANTRACITIC COAL IN FUJIAN PROVINCE FOR 440 t/h CFB BOILER
CORRECTION METHOD OF OUTGOING GAS TEMPERATURE IN PERFORMANCE TEST OF CFB BOILERS

Related Author

YIN Ji hu
HU Song
YAN Zhaoping
YOU Wenjie
ZHAO Hongyan
SU Jian-min(Longyan Power Generation Co Ltd
XIAO PingXi'an Thermal Power Research Institute Co Ltd
JIANG Min-hua

Related Institution

Shenhuo Group Environmental Protection Demonstration Power Station, Yongcheng
Moon Bay Gas Turbine Power Plant
Shenma Nylon Chemical Co., Ltd
Shenma Engineering Plastics Co., Ltd.
0