WANG Sheng-jie. CAUSE ANALYSIS OF SHAFT VIBRATION FOR UNIT NO.2 IN GUOHUA ZHUNGE’ER POWER PLANT AND TREATMENT THEREOF[J]. Thermal power generation, 2006, (4): 35-37.
DOI:
WANG Sheng-jie. CAUSE ANALYSIS OF SHAFT VIBRATION FOR UNIT NO.2 IN GUOHUA ZHUNGE’ER POWER PLANT AND TREATMENT THEREOF[J]. Thermal power generation, 2006, (4): 35-37. DOI: 10.19666/j.rlfd.2006.04.012.
CAUSE ANALYSIS OF SHAFT VIBRATION FOR UNIT NO.2 IN GUOHUA ZHUNGE’ER POWER PLANT AND TREATMENT THEREOF
摘要
国华准格尔电厂2号机组自投产以来
轴系2、3号轴承原始振动值达75μm左右
1号轴承轴颈在盘车状态下晃度大。2003年底
2号机组2、3号轴承频繁出现间歇性振动
最大峰值达134μm。2003年8月中旬以来
发电机7号轴承振动在增负荷时呈较大的增长趋势
最大达103μm
已严重影响到机组的正常稳定运行。通过对机组轴系振动在线监测数据和基建期间安装遗留问题的综合讨论分析
制定了相应的检修方案
在2004年初大修中实施后较好地解决了这些问题。
Abstract
Since putting unit no.2 at Guohua Zhunge’er Power Plant into operation
the original vibration of bearings no.2 and 3 in the shafting system reached about 75μm. The shaking of shaft neck in bearing no.1 was remarkable under condition of turning. At the end of year 2003
intermitent vibration also occurred frequently on bearings no.2 and 3 of unit no.2
max. peak value of vibration reached 134 μm. From middle ten days of August in 2003
the vibration of bearing no.7 concerning the generator in load augmentation has grater increasing tendency
max. value reaching 103 μm. affecting seriously normal and stable operation of the unit. Through comprehensive discussion and analysis of the on-line monitoring data for shaft vibration of the unit
as well as of problems left over during installation period in capital construction
corresponding repair scheme has been worked out. After implementation of said scheme in major repair at the begining of 2004
the above-mentioned problems have been fairly well solved.
SIMPLIFIED FINITEELEMENT CALCULATION MODEL OF TEMPERATURE FIELD FOR STEAM TURBINE ROTOR
APPLICATION OF SOLID SELF-LUBRICATING TECHNOLOGY IN POWER PLANTS
STUDY ON CONTROL SYSTEM SETTING OF DOUBLE EXTRACTION ADJUSTABLE STEAM TURBINE
ANALYSIS OF FAULTS OCCURRED IN SYNCHRONIZATION WITH POWER NETWORK FOR TAKING INITIAL LOAD BY STEAM TURBINE OF A 180MW GAS AND STEAM TURBINE COMBINED CYCLE UNIT
CAUSE ANALYSIS AND IMPROVEMENT MEASURES FOR PRESSURE REDUCTION OF LUBRICANT OIL DURING STARTUP OF 300MW UNITS