您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF DRAIN BLOCKAGE FOR LOWPRESSURE HEATERS NO.7 AND 8 OF 300 MW UNIT
更新时间:2025-09-28
    • CAUSE ANALYSIS OF DRAIN BLOCKAGE FOR LOWPRESSURE HEATERS NO.7 AND 8 OF 300 MW UNIT

    • Thermal Power Generation   Issue 4, Pages: 32-34(2006)
    • DOI:10.19666/j.rlfd.2006.04.011    

      CLC: TM621.3
    • Published:2006

    移动端阅览

  • CAUSE ANALYSIS OF DRAIN BLOCKAGE FOR LOWPRESSURE HEATERS NO.7 AND 8 OF 300 MW UNIT[J]. Thermal power generation, 2006, (4): 32-34. DOI: 10.19666/j.rlfd.2006.04.011.

  •  
  •  

0

Views

175

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ENHANCEMENT OF SAFETY AND ECONOMIC ASPECT FOR HEAT REGENERATIVE SYSTEM OF AN IMPORTED TYPE 300MW UNIT
Reason analysis and disposals of turbine's speed rise during unit's turning gear operation
APPLICATION OF FREQUENCY-CONVERTING TECHNOLOGY ON DRAIN PUMP FOR LP HEATER OF A 300MW UNIT
Linear auto disturbance rejection control system for water level in drum
PRIMARY FREQUENCY REGULATION PERFORMANCE TEST OF A 300MW FOSSIL-FIRED GENERATING UNIT

Related Author

ZHANG Cun-sheng
WANG Jiasheng
ZHAO Jie
ZHONG Jingliang
ZHANG Shihai
XU Xuesong
陈强
刘建华

Related Institution

The Pearl River Power Plant Guangzhou
Guizhou Electric Power Test and Research Institute
Xi'an Thermal Power Research Institute Co., Ltd
Zhanjiang Power Plant
School of Control and Computer Engineering, North China Electric Power University
0