您当前的位置:
首页 >
文章列表页 >
STUDY ON APPLICATION DOMAIN OF FF AND PROFIBUS FIELD BUS IN ENGINEERING OF THERMAL POWER PLANTS
更新时间:2025-09-28
    • STUDY ON APPLICATION DOMAIN OF FF AND PROFIBUS FIELD BUS IN ENGINEERING OF THERMAL POWER PLANTS

    • Thermal Power Generation   Issue 2, Pages: 40-44(2006)
    • DOI:10.19666/j.rlfd.2006.02.013    

      CLC: TK323
    • Published:2006

    移动端阅览

  • STUDY ON APPLICATION DOMAIN OF FF AND PROFIBUS FIELD BUS IN ENGINEERING OF THERMAL POWER PLANTS[J]. Thermal power generation, 2006, (2): 40-44. DOI: 10.19666/j.rlfd.2006.02.013.

  •  
  •  

0

Views

335

下载量

15

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Fieldbus commissioning method and problem handling for coal-fired power plants
PARSE SCREEN/EARTHING ANALYSIS OF THE FIELDBUS CONTROL SYSTEM
TEST OF THE RUNBACK FUNCTION IN A THERMAL POWER PLANT
DEVELOPMENT OF NETWORK NODAL POINTS’ DIAGNOSIS SOFTWARE FOR PROFIBUS FIELD BUS CONTROL SYSTEM IN THERMAL POWER PLANT
DISCUSSION ON APPLICATION OF FCS IN THE ASSISTANT CONTROL SYSTEM OF THERMAL POWER PLANT

Related Author

TAN Xiangshuai
CHEN Kun
GAO Kui
LIU Yu-sui1
Chen Yong2
Li Jun31.Guangdong Electric Power Research Institute
王俊洋
张烈

Related Institution

Xi'an Thermal Power Research Institute Co.,Ltd.
Guangdong Electric Power Design and Research Institute
Huaneng Shang'an Power Plant
Northwest Electric Power Construction Debugging and Construction Research Institute
0