XU Shou-cheng, WANG Wei. EXISTING PROBLEMS IN ASSETS EVALUATION OF THERMAL POWER PLANTS AT PRESENT AND SUGGESTIONS FOR IMPROVEMENT[J]. Thermal power generation, 2006, (2): 1-2.
DOI:
XU Shou-cheng, WANG Wei. EXISTING PROBLEMS IN ASSETS EVALUATION OF THERMAL POWER PLANTS AT PRESENT AND SUGGESTIONS FOR IMPROVEMENT[J]. Thermal power generation, 2006, (2): 1-2. DOI: 10.19666/j.rlfd.2006.02.001.
EXISTING PROBLEMS IN ASSETS EVALUATION OF THERMAL POWER PLANTS AT PRESENT AND SUGGESTIONS FOR IMPROVEMENT
摘要
针对当前我国评估机构的一些不合理之处
结合十多年评估工作实践
从电力资产的特点出发
对电力资产评估要素
如资金成本、合理建设工期、建设期利率、环保因素产生的经济性贬值等分别进行了论述。
Abstract
Directing against some unreasonable practices of evaluation organizations in China at present
combined with evaluation work practices of more than ten years
requirements for strengthening preparation work before assets evaluation in power industry have been put forward
and essential factors for assets evaluation in power industry
such as capital cost
reasonable construction period
interest rate in the construction period
economic depreciation resulting from environmental protection etc. being expounded.