DEBUGGING AND RETROFITTING OF THERMAL CONTROL SYSTEM FOR 600 MW SUPERCRITICAL UNITS IN HUANENG QINBEI POWER PLANT[J]. Thermal power generation, 2005, (12): 83-85.
DOI:
DEBUGGING AND RETROFITTING OF THERMAL CONTROL SYSTEM FOR 600 MW SUPERCRITICAL UNITS IN HUANENG QINBEI POWER PLANT[J]. Thermal power generation, 2005, (12): 83-85. DOI: 10.19666/j.rlfd.2005.12.027.
DEBUGGING AND RETROFITTING OF THERMAL CONTROL SYSTEM FOR 600 MW SUPERCRITICAL UNITS IN HUANENG QINBEI POWER PLANT
摘要
介绍了华能沁北电厂国产超临界600MW机组热控系统设计与调试情况
对存在的问题进行了改进
改进后系统工作正常
效果较好。
Abstract
The design and debugging situation of thermal control system for homemade supercritical 600MW units in Huaneng Qinbei power plant has been presented. Directing against existing problems
retrofit had been carried out. After retrofitting
the said control system becomes in normal operation