EXPLOSION PREVENTING RETROFIT AND OPERATION MEASURES FOR COAL PULVERIZING SYSTEM IN DAGANG POWER PLANT
更新时间:2025-09-28
    • EXPLOSION PREVENTING RETROFIT AND OPERATION MEASURES FOR COAL PULVERIZING SYSTEM IN DAGANG POWER PLANT

    • Thermal Power Generation   Issue 10, (2005)
    • DOI:10.19666/j.rlfd.2005.10.010    

      CLC: TK223.25
    • Published:2005

    移动端阅览

  • LIU Qiang. EXPLOSION PREVENTING RETROFIT AND OPERATION MEASURES FOR COAL PULVERIZING SYSTEM IN DAGANG POWER PLANT[J]. Thermal power generation, 2005, (10). DOI: 10.19666/j.rlfd.2005.10.010.

  •  
  •  

0

Views

107

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

PRACTICE OF CHANGING FEED-WATER TREATMENT MODE FOR 300 MW UNIT IN HEZE POWER PLANT FROM AVT(R) INTO AVT(O)
RETROFITING OF CLASSIFIER FOR BOILERS
CAUSES LEADING TO ABNORMALITY IN MEASUREMENT USING DRUM-LEVEL GAUGE IN ZHUNGE’R POWER PLANT
ANALYSIS OF TURBINE-BOILER COORDINATED CONTROL AND AGC SYSTEM IN YANGLUO POWER PLANT
CAUSE ANALYSIS OF CORROSION FOR CHEMICAL-DOSING TUBE ENTERING INTO THE DRUM PORT

Related Author

LI Xiu-juan Heze Power Plant
CHENG Shaohui
ZENG Hancai
CHANG Shi-ji
WANG Zhen
LI De-shi
CHEN Min
ZHANG Cuihong

Related Institution

Heze Power Plant
Huazhong University of Science and Technology
Zhungeer Power Plant Hohhot
Huaneng Yangluo Power Plant
0