您当前的位置:
首页 >
文章列表页 >
TRAIN OF THOUGHT FOR PRELIMINARY DESIGN OF CHIMNEYCOOLING TOWER INTEGRATED PROJECTS IN OUR COUNTRY
更新时间:2025-09-28
    • TRAIN OF THOUGHT FOR PRELIMINARY DESIGN OF CHIMNEYCOOLING TOWER INTEGRATED PROJECTS IN OUR COUNTRY

    • Thermal Power Generation   Issue 9, Pages: 1-4(2005)
    • DOI:10.19666/j.rlfd.2005.09.001    

      CLC: TM621
    • Published:2005

    移动端阅览

  • ZENG Deyoug, HE Yudong. TRAIN OF THOUGHT FOR PRELIMINARY DESIGN OF CHIMNEYCOOLING TOWER INTEGRATED PROJECTS IN OUR COUNTRY[J]. Thermal power generation, 2005, (9): 1-4. DOI: 10.19666/j.rlfd.2005.09.001.

  •  
  •  

0

Views

212

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

AN APPROACH TO THE EFFECTIVENESS OF USING CLEANING FACILITY FOR ROTARY REGENERATIVE FLUE GAS HEAT EXCHANGER IN FLUE GAS DESULFURATION SYSTEM
THE NECESSITY OF CARRYING OUT INDIVIDUAL TREATMENT FOR WASTE WATER FROM DESULFURATION IN THERMAL POWER PLANTS
STUDY ON FEASIBILITY OF WET FLUE GAS DESULFURATION WITHOUT GAS-GAS HEAT EXCHANGER
APPLICATION OF FLUE GAS AUTOMATIC CONTINUOUS EMISSION MONITORING SYSTEM
APPLICATION OF NEW DESULFURARTION TECHNOLOGY OF SAAS FOR4×260 th BOILERS

Related Author

HU Xiu-li
FU Wen-ling
WEI Guoping
HOU Wen-long(North China Electric Power University
WANG Yang
CHANG Ai-ling
HUI Yuan-feng
HU Zhi-guang

Related Institution

Bawei Company Beijing Representative Office
Zhongdian Guohua Beijing Thermal Power Branch
Zhejiang Tianlan desulfurization and dust removal Co., Ltd
North China Electric Power University
Huaju Energy Jidong Branch
0