您当前的位置:
首页 >
文章列表页 >
RESIDUAL SERVICE-LIFE ASSESSMENT OF THE 10CrMo910 MAIN STEAM PIPE-LINE IN THERMAL POWER PLANT UNDER ANQING PETROCHEMICAL COMPANY
更新时间:2025-09-28
    • RESIDUAL SERVICE-LIFE ASSESSMENT OF THE 10CrMo910 MAIN STEAM PIPE-LINE IN THERMAL POWER PLANT UNDER ANQING PETROCHEMICAL COMPANY

    • Thermal Power Generation   Issue 7, Pages: 40-42(2005)
    • DOI:10.19666/j.rlfd.2005.07.012    

      CLC: TM621
    • Published:2005

    移动端阅览

  • QIAN Xian-min, JIA Jian-min, LIANG Chang-qian. RESIDUAL SERVICE-LIFE ASSESSMENT OF THE 10CrMo910 MAIN STEAM PIPE-LINE IN THERMAL POWER PLANT UNDER ANQING PETROCHEMICAL COMPANY[J]. Thermal power generation, 2005, (7): 40-42. DOI: 10.19666/j.rlfd.2005.07.012.

  •  
  •  

0

Views

140

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

STUDY ON PERFORMANCE OF HIGH HARDNESS AND LOW HARDNESS WELD JOINTS ON P91 MAIN STEAM PIPE

Related Author

LI Yi-min1
SHI Zhi-gang1
CAI Lian-yuan2
YAN Jian-bin2
WANG Da-guang2
GUI Li-cheng2(1.Xi'an Thermal Power Research Institute Co Ltd

Related Institution

Xigu Thermal Power Co., Ltd
0