您当前的位置:
首页 >
文章列表页 >
OPTIMIZATION OF DEB COORDINATED CONTROL SYSTEM FOR 300 MW UNIT
更新时间:2025-09-28
    • OPTIMIZATION OF DEB COORDINATED CONTROL SYSTEM FOR 300 MW UNIT

    • Thermal Power Generation   Issue 4, Pages: 44-46(2005)
    • DOI:10.19666/j.rlfd.2005.04.012    

      CLC: TK323
    • Published:2005

    移动端阅览

  • HE Tong-xiang, ZHANG Hua-lei, LI Ya-jun. OPTIMIZATION OF DEB COORDINATED CONTROL SYSTEM FOR 300 MW UNIT[J]. Thermal power generation, 2005, (4): 44-46. DOI: 10.19666/j.rlfd.2005.04.012.

  •  
  •  

0

Views

183

下载量

11

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

DEVELOPMENT AND APPLICATION OF REMOTE MONITORING SYSTEM FOR CHEMICALS DOSING IN WATER TREATMENT OF POWER PLANTS
RETROFITTING OF AUXILIARY VALVE FOR SOLENOID BLOWOUT VALVES
COMPREHENSIVE CONTROL OF DUST POLLUTION IN COAL HANDLING SILO BAY OF POWER PLANT
ANALYSIS OF AN ACCIDENT CONCERNING SERIOUS EMULSIFICATION OF THE TURBINE OIL
APPLICATION OF REVERSE OSMOSIS TECHNOLOGY IN POWER PLANTS OF CHINA AND DEVELOPING TENDENCY THEREOF

Related Author

XU Ting
YANG Wansheng
LUO Sheng
HUANG Qiang
WU Ping
WU Sanmao
XIE Chun-sheng
ZHANG Xiao-ping

Related Institution

Wuhan University
The Pearl River Power Plant Guangdong
Anqing Petrochemical Plant Thermal Power Plant
Jiangxi Electric Power Test and Research Institute
South China University of Technology
0