您当前的位置:
首页 >
文章列表页 >
DESIGN AND ECONOMIC OPERATION OF DOUBLE-SPEED CIRCULATORY WATER PUMP FOR 135 MW INDIRECT AIR-COOLED UNIT
更新时间:2025-09-28
    • DESIGN AND ECONOMIC OPERATION OF DOUBLE-SPEED CIRCULATORY WATER PUMP FOR 135 MW INDIRECT AIR-COOLED UNIT

    • Thermal Power Generation   Issue 4, Pages: 38-40(2005)
    • DOI:10.19666/j.rlfd.2005.04.010    

      CLC: TK264.12
    • Published:2005

    移动端阅览

  • AN Gui-cheng. DESIGN AND ECONOMIC OPERATION OF DOUBLE-SPEED CIRCULATORY WATER PUMP FOR 135 MW INDIRECT AIR-COOLED UNIT[J]. Thermal power generation, 2005, (4): 38-40. DOI: 10.19666/j.rlfd.2005.04.010.

  •  
  •  

0

Views

135

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

THE INFLUENCE OF STEAM FLOW FIELD AT CONDENSER'S TUBEBUNDLE INLET UPON EXHAUST PRESSURE OF STEAM TURBINE
AN APPROACH TO NEW DEFINITION OF THE OPTIMAL VACUUM IN CONDENSERS
MEASURES FOR ENHANCING VACUUM IN OPERATION OF CONDENSER
A MODEL FOR PREDICTING VACUUM IN THE CONDENSER BASED ON ELMAN NEURAL NETWORK BY USING PARTICLE SWARM OPTIMIZATION ALGORITHM
STUDY ON TEST METHOD OF DIRECT AIR-COOLING SYSTEM

Related Author

PENG Xiangyu
WANG Hongtao
WAN Kuifang
YANG Qin
ZHANG Xi-gen
CHEN Yu-hao
XU Hao
QIAN Xu-ming 1.Changxing Power Generation Co Ltd

Related Institution

Shenyang Institute of Technology
Datang Changshan Thermal Power Plant
Huazhong Power Grid Co., Ltd
Changxing Power Generation Co., Ltd
0