您当前的位置:
首页 >
文章列表页 >
RETROFIT OF GLAND-PACKING FOR 300MW STEAM TURBINE IN HUAYANG POWER-GENERATION COMPANY
更新时间:2025-09-28
    • RETROFIT OF GLAND-PACKING FOR 300MW STEAM TURBINE IN HUAYANG POWER-GENERATION COMPANY

    • Thermal Power Generation   Issue 3, Pages: 45-48(2005)
    • DOI:10.19666/j.rlfd.2005.03.016    

      CLC: TK263.63
    • Published:2005

    移动端阅览

  • YANG Zhi-feng. RETROFIT OF GLAND-PACKING FOR 300MW STEAM TURBINE IN HUAYANG POWER-GENERATION COMPANY[J]. Thermal power generation, 2005, (3): 45-48. DOI: 10.19666/j.rlfd.2005.03.016.

  •  
  •  

0

Views

149

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

AN APPROACH TO OPERATING MODE OF CIRCULATING WATER PUMP FOR 300MW UNIT
CAUSE ANALYSIS AND IMPROVEMENT MEASURES FOR PRESSURE REDUCTION OF LUBRICANT OIL DURING STARTUP OF 300MW UNITS
CAUSES ANALYSIS OF BIG TEMPERATURE DIFFERENCE BTWEEN CASINGS OF UNIT NO.9 IN SHAOGUAN POWER PLANT AND TREATMENT THEREOF
SHAFTING VIBRATION ANALYSIS AND OPTIMIZATION FOR A 135 MW TURBOGENERATOR UNIT

Related Author

ZHAI Pei qiang
ZHANG Dekui
ZHENG Cai-ping
HE Jian-kang
SONG Wen-xi
SONG Bin
XI Zhu-zui
YUAN Li-bo 1.Shandong Electric Research Power Institute

Related Institution

Weihe Power Generation Co., Ltd.
Shaoguan Power Plant
Xi'an Thermal Power Research Institute Co., Ltd
Shandong Electric Power Research Institute
Huadian Zhangqiu Power Plant
0