您当前的位置:
首页 >
文章列表页 >
TEST STUDY ON VARYING STEAM PRESSURE SOOTBLOWERS FOR 300MW UNIT NO.1 IN QINGDAO POWER PLANT
更新时间:2025-09-28
    • TEST STUDY ON VARYING STEAM PRESSURE SOOTBLOWERS FOR 300MW UNIT NO.1 IN QINGDAO POWER PLANT

    • Thermal Power Generation   Issue 11, Pages: 36-38(2004)
    • DOI:10.19666/j.rlfd.2004.11.011    

      CLC: TK227
    • Published:2004

    移动端阅览

  • TEST STUDY ON VARYING STEAM PRESSURE SOOTBLOWERS FOR 300MW UNIT NO.1 IN QINGDAO POWER PLANT[J]. Thermal power generation, 2004, (11): 36-38. DOI: 10.19666/j.rlfd.2004.11.011.

  •  
  •  

0

Views

117

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Development and numerical simulation for a high efficiency steam soot blower
ANALYSIS FOR INFLUENCE OF FURNACE POLLUTION AND PURGING UPON OPERATION OF CONVECTIVE HEATING SURFACE
ANALYSIS ABOUT INFLUENCE OF COAL’S FOULING PROPERTY UPON HEAT TRANFER OF HEATING SURFACES
Research on main and reheat steam temperature lifting method for ultra supercritical 1 000 MW unit double-tangential circular boiler
Analysis on mechanism and economic benefit of a new type of steam pulsed acoustic dust cleaning device

Related Author

LU Quan
LI Yanbing
HAO Jian
HU Jiantao
LU Bingxin
FAN Quangui
FAN Zengquan
LU Jingni

Related Institution

School of Environmental Science Engineering, North China Electric Power University
Guohua Sanhe Power Generation Limited Liability Company
School of Energy, Power and Mechanical Engineering, North China Electric Power University
Shaanxi Electric Power Fuel Co., Ltd.
西安远能新能源科技有限公司
0