您当前的位置:
首页 >
文章列表页 >
TEST AND STUDY ON OVERTEMPERATURE TUBEBURST OF HEATING SURFACE FOR 670t/h BOILER IN ZHANGZE POWER PLANT
更新时间:2025-09-28
    • TEST AND STUDY ON OVERTEMPERATURE TUBEBURST OF HEATING SURFACE FOR 670t/h BOILER IN ZHANGZE POWER PLANT

    • Thermal Power Generation   Issue 10, Pages: 47-49(2004)
    • DOI:10.19666/j.rlfd.2004.10.014    

      CLC: TK223.3
    • Published:2004

    移动端阅览

  • TEST AND STUDY ON OVERTEMPERATURE TUBEBURST OF HEATING SURFACE FOR 670t/h BOILER IN ZHANGZE POWER PLANT[J]. Thermal power generation, 2004, (10): 47-49. DOI: 10.19666/j.rlfd.2004.10.014.

  •  
  •  

0

Views

141

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

NEW CALCULATION SOFTWARE AND ITS PRACTICAL APPLICATION FOR CALCULATING WALL TEMPERATURE OF HIGH TEMPERATURE CONVECTIVE HEATING SURFACE FOR A BOILER
TEST AND ANALYSIS OF FREQUENT TUBE-BURST ON THE STEAM-COOLED WALL OF BOILER NO.1 IN ONE POWER PLANT
CAUSE ANALYSIS OF TUBE-BURST ON HIGH-TEMPERATURE SUPERHEATER OF BOILER EQUIPPED FOR 600 MW UNITS AND PREVENTIVE MEASURES THEREOF
Influence of SOFA yaw angle on residual swirling of flue gas in a 300 MW tangentially fired pulverized-coal boiler
STUDY ON OVER-TEMPERATURE OF PLATEN TYPE REHEATER FOR BOILERS WITH FOUR CORNER TANGENTIAL FIRING

Related Author

DENG Guangfa
XUE Shou-hong1
WEI Zhi-gang1
XU Pei1
LU Yu-long2
XU Run-sheng11.Inner Mongolian Electric Power Science Research Institute
ZHANG Jiwen
YUAN Yanming

Related Institution

Jiangsu Electric Power Research Institute
Inner Mongolia Electric Power Research Institute
Mengda Power Generation Co., Ltd
Shanwei Power Plant
Key Laboratory of Condition Monitoring and Control for Power Plant Equipment, North China Electric Power University
0