ZHOU Guang-qiang. RETROFIT OF COMPRESSED AIR SYSTEM USED FOR INSTRUMENTS OF 300 MW UNITS IN ZHUJIANG POWER PLANT[J]. Thermal power generation, 2004, (8): 60-61.
DOI:
ZHOU Guang-qiang. RETROFIT OF COMPRESSED AIR SYSTEM USED FOR INSTRUMENTS OF 300 MW UNITS IN ZHUJIANG POWER PLANT[J]. Thermal power generation, 2004, (8): 60-61. DOI: 10.19666/j.rlfd.2004.08.019.
RETROFIT OF COMPRESSED AIR SYSTEM USED FOR INSTRUMENTS OF 300 MW UNITS IN ZHUJIANG POWER PLANT
摘要
珠江电厂 30 0MW机组仪用压缩空气系统在运行过程中
系统备用余量不足
空气压缩机 (空压机 )及其冷却水系统常发生故障
严重威胁发电机组的安全运行
经分析并采取了相应的完善改进措施
以及对空压机改型后
达到了预期效果
提高了仪用压缩空气系统运行的安全性、可靠性、经济性。
Abstract
In Operation process of the compressed air system used for instruments of 300 MW in Zhujiang Power Plant
troubles of the air compressor and water cooling system are frequently occurred due to insuffiecent back-up capability of the system
threatening seriouly safe operation of the generating units. Directing against the problems existing in the compressed air system
systematic analysis has been carried out
performaing improvement for perfection and retrofit of the air compressor. Practice shows that a series of retrofitting measures has enhanced the safety
reliability
and economic behavier of the compressed air system