您当前的位置:
首页 >
文章列表页 >
ANALYSIS OF RAPID START-UP AND THERMAL ECONOMIC PERFORMANCE FOR 330MW UNITS MANUFACTURED BY BEI-ZHONG STEAMTURBINE CO LTD
更新时间:2025-09-28
    • ANALYSIS OF RAPID START-UP AND THERMAL ECONOMIC PERFORMANCE FOR 330MW UNITS MANUFACTURED BY BEI-ZHONG STEAMTURBINE CO LTD

    • Thermal Power Generation   Issue 8, Pages: 1-3(2004)
    • DOI:10.19666/j.rlfd.2004.08.001    

      CLC: TK262
    • Published:2004

    移动端阅览

  • LI Bin. ANALYSIS OF RAPID START-UP AND THERMAL ECONOMIC PERFORMANCE FOR 330MW UNITS MANUFACTURED BY BEI-ZHONG STEAMTURBINE CO LTD[J]. Thermal power generation, 2004, (8): 1-3. DOI: 10.19666/j.rlfd.2004.08.001.

  •  
  •  

0

Views

83

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Evaluation methods for turbine steam seal retrofitting
Thermal-economic analysis for scheme of steam turbine generator placement in high and low platform separately
Economic analysis of steam seal modification for a steam turbine unit
Definition review of heat rate in thermal power plant evaluation
Thermal economic analysis for adding low-temperature economizer in boilers

Related Author

FU Chang
NING Zhe
FU Yiwei
XIE Tian
QU Jie
DING Changfu
LI Zunping
LIU Zhibo

Related Institution

Xi'an Thermal Power Research Institute Co.,Ltd.
Xi’an Thermal Power Research Institute Co., Ltd.
School of Energy Power and Mechanical Engineering, North China Electric Power University
Xi’an Thermal Power Research Institute Co., Ltd.
Key Laboratory of Condition Monitoring and Control for Power Plant Equipment of Ministry of Education, North China Electric Power University
0