DCS SYSTEM AND CONTROL SCHEME OF CFB BOILER FOR 135MW UNIT IN SHENHUA EVIRONMENT PROTECTION DEMONSTRATING POWER PLANT
更新时间:2025-09-28
    • DCS SYSTEM AND CONTROL SCHEME OF CFB BOILER FOR 135MW UNIT IN SHENHUA EVIRONMENT PROTECTION DEMONSTRATING POWER PLANT

    • Thermal Power Generation   Issue 7, Pages: 57-60(2004)
    • DOI:10.19666/j.rlfd.2004.07.017    

      CLC: TK32
    • Published:2004

    移动端阅览

  • YIN Ji hu. DCS SYSTEM AND CONTROL SCHEME OF CFB BOILER FOR 135MW UNIT IN SHENHUA EVIRONMENT PROTECTION DEMONSTRATING POWER PLANT[J]. Thermal power generation, 2004, (7): 57-60. DOI: 10.19666/j.rlfd.2004.07.017.

  •  
  •  

0

Views

97

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

DEVELOPMENT OF SPARE SPACE FOR DISTRIBUTED CONTROL SYSTEM AND ITS APPLICATION IN ENGINEERING
SUPERFICIAL VIEWS TO ENHANCING THE LEVEL OF DCS CONTROL FOR 2×600MW SUPERCRITICAL UNITS IN SHANWEI POWER PLANT
DESIGN OF CONTROL SYSTEM FOR HOMEMADE 410 t/h CFB BOILERS
CAUSE ANALYSIS OF PRIMARY FAN VIBRATION FOR A 130 t/h CFB BOILER
DESIGN OF CONTROL SYSTEMS FOR 440 t/h CFB BOILERS IN YUELIAN POWER PLAN

Related Author

CHEN Hengzhong
HU Baiyong
YANG Hua
ZENG Hao
WANG Zhiwei
LIU Hanshen
LI Jun
YAN Zhaoping

Related Institution

Jiaxing Power Generation Co., Ltd
Jiaxing Power Generation Co., Ltd.
Honghai Bay Power Generation Co., Ltd.
Xi'an Thermal Power Research Institute Co., Ltd
0