您当前的位置:
首页 >
文章列表页 >
STUDY ON PROBLEMS OF SCALING AND CLOGGING IN WET CALCIUM FLUE GAS DESULFURATION FACILITY OF MEDIUM-AND SMAL-LSCALE INDUSTRIAL BOILERS
更新时间:2025-09-28
    • STUDY ON PROBLEMS OF SCALING AND CLOGGING IN WET CALCIUM FLUE GAS DESULFURATION FACILITY OF MEDIUM-AND SMAL-LSCALE INDUSTRIAL BOILERS

    • Thermal Power Generation   Issue 6, Pages: 31-34(2004)
    • DOI:10.19666/j.rlfd.2004.06.008    

      CLC: TK227
    • Published:2004

    移动端阅览

  • STUDY ON PROBLEMS OF SCALING AND CLOGGING IN WET CALCIUM FLUE GAS DESULFURATION FACILITY OF MEDIUM-AND SMAL-LSCALE INDUSTRIAL BOILERS[J]. Thermal power generation, 2004, (6): 31-34. DOI: 10.19666/j.rlfd.2004.06.008.

  •  
  •  

0

Views

196

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

PERFORMANCE TEST AND TECHNICAL ANALYSIS OF NEW TYPE LIQUIDCOLUMN INJECTING DESULPHURIZATION TECHNOLOGY
Economic research on desulfurization and denitration for a supercritical 350 MW circulating fluidized bed boiler
Formation mechanisms and block reason analysis for deposition in ammonia transportation pipeline of ammonia station in a power plant
Ultra-low emission reform and its influence on the plant’s electricity supply cost

Related Author

黄斌
姚强
项光明
李水清
张贞良
WANG Lin
GAO Jihui
CHE Hongwei

Related Institution

Tsinghua Tongfang Energy and Environment Co., Ltd.
Tsinghua University
School of Energy Science and Engineering, Harbin Institute of Technology
Xi’an Thermal Power Research Institute Co., Ltd.
Shenhua Guoneng (Shendong Power) Group
0