DEBUGGING OF A 1025t/h WSHAPED FLAME BOILER IN SHAOGUAN POWER PLANT[J]. Thermal power generation, 2004, (5): 25-28.
DOI:
DEBUGGING OF A 1025t/h WSHAPED FLAME BOILER IN SHAOGUAN POWER PLANT[J]. Thermal power generation, 2004, (5): 25-28. DOI: 10.19666/j.rlfd.2004.05.008.
DEBUGGING OF A 1025t/h WSHAPED FLAME BOILER IN SHAOGUAN POWER PLANT
摘要
介绍了韶关电厂 10 2 5t/hW型火焰锅炉的设计特性、燃煤特性、主要系统
以及锅炉试运行和燃烧调整情况
对锅炉设计和运行中存在的问题进行了分析。试运行过程中所取得的成绩和经验
对W型火焰锅炉的进一步发展和完善有较高的参考意义。
Abstract
The design features
coal properties
main systems
as well as trial operation and combustion adjustment of a 1025t/h Wshaped flame boiler in Shaoguan PowerPlant have been presented
the problems existin gin boiler design and in operation being discussed. The achiements and experiences obtained in trial operation of said unit have significance for reference in developing and perfecting the Wshaped flame boilers.