DEBUGGING OF A 1025t/h WSHAPED FLAME BOILER IN SHAOGUAN POWER PLANT
更新时间:2025-09-28
    • DEBUGGING OF A 1025t/h WSHAPED FLAME BOILER IN SHAOGUAN POWER PLANT

    • Thermal Power Generation   Issue 5, Pages: 25-28(2004)
    • DOI:10.19666/j.rlfd.2004.05.008    

      CLC: TK227.1
    • Published:2004

    移动端阅览

  • DEBUGGING OF A 1025t/h WSHAPED FLAME BOILER IN SHAOGUAN POWER PLANT[J]. Thermal power generation, 2004, (5): 25-28. DOI: 10.19666/j.rlfd.2004.05.008.

  •  
  •  

0

Views

144

下载量

13

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE ANALYSIS OF LOWER BURN-UP RATIO IN ANTHRACITE FIRING BOILERS WITH W-SHAPED FLAME AND TWIN-ARCH COMBUSTION
STUDY ON SULFER RELEASING BEHAVIOR FROM ONEDIMENSIONAL COMBUSTION OF MIXED COAL COMPOSED OF LEAN COAL AND ANTHRACITIC COAL
CAUSE ANALYSIS OF HIGHER MAIN STEAM TEMPERATURE DURING ROTATION-IMPULSING TO START UP 600 MW SUPERCRITICAL UNIT AND ADOPTED MEASURES
Experimental study on co-firing of anthracite and bituminous coal in a W-flame boiler
Research progress of conversion and utilization of upgraded lignite by hydrothermal dewatering

Related Author

单凤玲
王新华
李英杰
路春美
刘汉涛
赵改菊
王永征
韩奎华

Related Institution

Wuhan Boiler Co., Ltd
Wuhan Boiler Co., Ltd.
Shandong University
Hunan Electric Power Test and Research Institute
Xi'an Thermal Power Research Institute Co., Ltd
0