您当前的位置:
首页 >
文章列表页 >
APPLICATION OF MEASURED DATA CHECKING AND REBUILDING METHOD IN PERFORMANCE MONITORING SYSTEM OF THERMAL POWER PLANTS
更新时间:2025-09-28
    • APPLICATION OF MEASURED DATA CHECKING AND REBUILDING METHOD IN PERFORMANCE MONITORING SYSTEM OF THERMAL POWER PLANTS

    • Thermal Power Generation   Issue 3, Pages: 11-13(2004)
    • DOI:10.19666/j.rlfd.2004.03.004    

      CLC: TM621
    • Published:2004

    移动端阅览

  • APPLICATION OF MEASURED DATA CHECKING AND REBUILDING METHOD IN PERFORMANCE MONITORING SYSTEM OF THERMAL POWER PLANTS[J]. Thermal power generation, 2004, (3): 11-13. DOI: 10.19666/j.rlfd.2004.03.004.

  •  
  •  

0

Views

98

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Design and implementation of intelligent water island control system for thermal power units
Control strategy for automatic parallel operation of feed water pumps in a 630 MW coal-fired unit
Discussions on practical intelligent optimization control technologies for thermal power units
Application of fuzzy adaptive PID controller in condensate throttling technology
Optimization and analysis of cold-end system in thermal power units

Related Author

TIAN Shuang
SONG Meiyan
LI Yadu
WANG Xihui
CHEN Houtao
PENG Shuangjian
FU Qiang
XUN Xin

Related Institution

Xi’an Thermal Power Research Institute Co., Ltd.
State Grid Hunan Electric Power Company Research Institute
Hunan Xiangdian Test and Research Institute Co. Ltd.
Hunan Province Key Laboratory of High Efficiency and Clean Thermal Power Technology
Northwest Power Construction Supervision Ltd.
0