DESIGN AND ANALYSIS OF THE SPRAY TOWER PROPER FOR FLUE GAS DESULPHURIZATION[J]. Thermal power generation, 2004, (1): 29-31.
DOI:
DESIGN AND ANALYSIS OF THE SPRAY TOWER PROPER FOR FLUE GAS DESULPHURIZATION[J]. Thermal power generation, 2004, (1): 29-31. DOI: 10.19666/j.rlfd.2004.01.008.
DESIGN AND ANALYSIS OF THE SPRAY TOWER PROPER FOR FLUE GAS DESULPHURIZATION
摘要
对湿式烟气脱硫喷淋塔本体尺寸进行了分析
结合已有的工程设计经验
给出了确定喷淋塔本体尺寸的具体步骤
并讨论了设计应考虑的主要问题。
Abstract
Theoritical analysis of influence factors upon dimensions of the spray tower proper for wet flue gas desulphuriz ation has been carried out. Combined with existing experience in project design
concrete steps for determining dimensions of the spray tower proper are given
and main factors needing to be considered in design being discussed.