TEST AND STUDY ON ELEVATION CHANGING REGULARITY OF LP CYLINDER AND LP BEARINGS FOR A 300MW STEAM TURBINE[J]. Thermal power generation, 2003, (12): 21-24.
DOI:
TEST AND STUDY ON ELEVATION CHANGING REGULARITY OF LP CYLINDER AND LP BEARINGS FOR A 300MW STEAM TURBINE[J]. Thermal power generation, 2003, (12): 21-24. DOI: 10.19666/j.rlfd.2003.12.008.
TEST AND STUDY ON ELEVATION CHANGING REGULARITY OF LP CYLINDER AND LP BEARINGS FOR A 300MW STEAM TURBINE
摘要
通过现场测试
研究了国产 30 0MW汽轮机在运行过程中低压缸和低压轴承标高的动态变化规律。研究结果表明
真空和排汽温度是影响低压缸和低压轴承动态标高的主要因素。真空和排汽温度越高
轴承标高降低得越多。该型机组低压缸和低压轴承的标高变化规律基本一致
Abstract
Through tests in the field
the dynamic elevation changing regularity of low pressure (LP) cydinder and LP bearings in operation course of a 300MW steam turbine has been studied.Results of Study show that the vacuum and exhaust steam temperature are main factors influencing upon the dynamic elevation of LP cylinder and LP bearings of said unit.The higher the vacuum is
the more the evelation lowers; the higher the exhaust steam temperature is
the more the elevation lowers. The elevation changing regularity of LP cylinder and LP bearings of this type units is basically consistent.
COMPARISON AND ANALYSIS OF THERMODYNAMIC PERFORMANCE BEFORE AND AFTER RETROFITTING A 300MW UNIT AT JIANBI POWER PLANT
BENDING ROTOR'S VIBRATION CONTROL OF STEAM TURBINE FOR A 300MW UNIT
CAUSE ANALYSIS OF BLADE BREAKAGE IN LOWPRESSURE CYLINDER OF C50-90/13 TYPE STEAM TURBINE AND COMPARISON OF RESOLVING COUNTERMEASURES THEREOF
RETROFIT OF LOW-PRESSURE CASING'S FLOW PASSAGE FOR 200 MW STEAM TURBINES IN SHAOGUANG POWER PLANT
ANALYSIS OF LARGE TEMPERATURE DIFFERENCE OCCURRED ON BEARING SHOE NO.5 AND NO.6 OF LOWPRESSURE CYLINDER IN STEAM TURBINE NO.1 AT GUOHUA ZHUNGEER POWER PLANT
Related Author
DAI Chuan-long
袁立平
罗剑斌
李力
谭士森
孙志宝
董远景
郑彩平
Related Institution
Jianbi Power Plant
Henan Electric Power Test and Research Institute
Henan Electric Power Test and Research Institute Zhengzhou