LOAD REJECTION TEST FOR UNIT NO.4 OF SHENYANG THERMAL POWER PLANT[J]. Thermal power generation, 2003, (11): 74-75.
DOI:
LOAD REJECTION TEST FOR UNIT NO.4 OF SHENYANG THERMAL POWER PLANT[J]. Thermal power generation, 2003, (11): 74-75. DOI: 10.19666/j.rlfd.2003.11.024.
在背压式汽轮机组调节系统改造后
成功地实施了常规法甩负荷试验
结果表明
机组改造为纯电液调节系统后
动态调节特性良好。改造及试验对背压机组甩负荷试验有一定的参考价值
After retrofitting the governing system of a backpressure steam turbine unit
the normal load rejection test has been successfully implemented
having certain reference value for load rejection test of backpressure units.