您当前的位置:
首页 >
文章列表页 >
LOAD REJECTION TEST FOR UNIT NO.4 OF SHENYANG THERMAL POWER PLANT
更新时间:2025-09-28
    • LOAD REJECTION TEST FOR UNIT NO.4 OF SHENYANG THERMAL POWER PLANT

    • Thermal Power Generation   Issue 11, Pages: 74-75(2003)
    • DOI:10.19666/j.rlfd.2003.11.024    

      CLC: TK267
    • Published:2003

    移动端阅览

  • LOAD REJECTION TEST FOR UNIT NO.4 OF SHENYANG THERMAL POWER PLANT[J]. Thermal power generation, 2003, (11): 74-75. DOI: 10.19666/j.rlfd.2003.11.024.

  •  
  •  

0

Views

54

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Filed test of collaborative disposal of industrial sludge in pulverized coal boiler
THE INFLUENCE OF CIRCULATORY WATER′S TEMPERATUER RAISE UPON UNIT′S ECONOMIC ASPECT AND COUNTERMEASURES THERSOF
反渗透浓排水和矿井排水用作电厂循环冷却水的试验与实践
ADJUSTMENT OF FRONT BEARING BOX AND ROTOR'S UPLIFT DEGREE FOR STEAM TURBINE NO.4 AT THERMAL POWER PLANT UNDER QILU PETROCHEMICAL INC
TREATMENT OF ABNORMALITY CONCERNING LOWER OIL PRESSURE IN EH FIRE-RESISTANT OIL SYSTEM OF UNIT NO.1 AT SHOUYANGSHAN POWER PLANT

Related Author

LI Chang
LIU Hongkun
ZHANG Han
FANG Lijun
YIN Libao
CAO Tong
叶晓东
杜增辉

Related Institution

College of Energy Power and Mechanical Engineering,North China Electric Power University
Electric Power Research Institute of Guangdong Power Grid Co.,Ltd.
Karamay Petrochemical Plant Thermal Power Plant Karamay
Thermal Power Plant of Karamay Petrochemical Plant
Guodian Thermal Power Research Institute Shaanxi Shenmu
0