您当前的位置:
首页 >
文章列表页 >
TESTING STUDY AND COMPREHESIVE WAY TO CONTROL SLAGGING IN THE FURNACE AND OVERTEMPERATURE OF THE SUPERHEATER FOR BOILER No.8 IN BAOTOU THERMAL POWER PLANT No.1
更新时间:2025-09-28
    • TESTING STUDY AND COMPREHESIVE WAY TO CONTROL SLAGGING IN THE FURNACE AND OVERTEMPERATURE OF THE SUPERHEATER FOR BOILER No.8 IN BAOTOU THERMAL POWER PLANT No.1

    • Thermal Power Generation   Issue 10, Pages: 41-43(2003)
    • DOI:10.19666/j.rlfd.2003.10.013    

      CLC: TK228
    • Published:2003

    移动端阅览

  • TESTING STUDY AND COMPREHESIVE WAY TO CONTROL SLAGGING IN THE FURNACE AND OVERTEMPERATURE OF THE SUPERHEATER FOR BOILER No.8 IN BAOTOU THERMAL POWER PLANT No.1[J]. Thermal power generation, 2003, (10): 41-43. DOI: 10.19666/j.rlfd.2003.10.013.

  •  
  •  

0

Views

82

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Arrangement optimization for temperature measuring points on tube wall of (ultra) supercritical boilers
OPTIMIZTION OF RETROFITTNG SCHEME FOR THE COMBUSTIN SYSTEM
四川维尼纶厂9号锅炉结焦问题的分析与处理
Retrofitting of burning bituminous coal for a 300MW unit boiler and the anti-coking countermeasures
Operation adjustment for high temperature corrosion in water wall of supercritical opposed firing boiler

Related Author

LI Ying
ZHANG Junjie
DONG Kun
修兴京
许家济
刘隆平
ZHENG Guo
LONG Xinfeng

Related Institution

Shenhua Guohua Electric Power Research Institute Company Limitied
Zhuhai Power Plant
Yunfu Power Plant
Sichuan Vinylon Factory Chongqing Changshou
Zhanjiang Electric Power Co., Ltd
0