RETROFIT OF TWO 130t/h PULVERIZED COAL BOILERS IN YILI THERMAL POWER PLANT NO.2 DUE TO HIGH EXHAUST GAS TEMPERATURE THEREOF
更新时间:2025-09-28
    • RETROFIT OF TWO 130t/h PULVERIZED COAL BOILERS IN YILI THERMAL POWER PLANT NO.2 DUE TO HIGH EXHAUST GAS TEMPERATURE THEREOF

    • Thermal Power Generation   Issue 9, Pages: 34-35(2003)
    • DOI:10.19666/j.rlfd.2003.09.011    

      CLC: TK229
    • Published:2003

    移动端阅览

  • RETROFIT OF TWO 130t/h PULVERIZED COAL BOILERS IN YILI THERMAL POWER PLANT NO.2 DUE TO HIGH EXHAUST GAS TEMPERATURE THEREOF[J]. Thermal power generation, 2003, (9): 34-35. DOI: 10.19666/j.rlfd.2003.09.011.

  •  
  •  

0

Views

75

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Influence of preheating temperature of nature gas on performance of gas-stem combined cycle
TECHNICAL STUDY FOR RETROFITTING A 75t/h PULVERIZED COAL BOILER INTO A FLUID BED ONE AT ULANBATOR POWER PLANT NO.3, THE MONGOLIAN PEOPLE'S REPUBLIC
Energy conservation analysis for waste heat utilization system applying air preheater and using primary air to heat condensate water
Numerical simulation on thermodynamic characteristics of air preheater bypass flue gas waste heat utilization system
Temperature independent control for direct-firing pulverizing system

Related Author

FU Zhongguang
WANG Xiaonan
LU Ke
ZHANG Hui
高洪培
徐正泉
肖平
马丽锦

Related Institution

National Thermal Power Engineering & Technology Research Centre, North China Electric Power University
School of Energy Power and Mechanical Engineering, North China Electric Power University
Xi’an TPRI Energy Conservation Technology Co., Ltd.
China Energy Engineering Group Northwest China Electrical Power Test Research Institute Co., Ltd.
Huangshi Power Plant,Huadian Corporation Hubei Branch