您当前的位置:
首页 >
文章列表页 >
INSTALLATION AND TYPE-SELECTION OF THE BY-PASS SYSTEM FOR 600MW SUPERCRITICAL UNIT AT QINBEI POWER PLANT
更新时间:2025-09-28
    • INSTALLATION AND TYPE-SELECTION OF THE BY-PASS SYSTEM FOR 600MW SUPERCRITICAL UNIT AT QINBEI POWER PLANT

    • Thermal Power Generation   Issue 7, Pages: 10-12(2003)
    • DOI:10.19666/j.rlfd.2003.07.003    

      CLC: TK267
    • Published:2003

    移动端阅览

  • Huo Dongfang. INSTALLATION AND TYPE-SELECTION OF THE BY-PASS SYSTEM FOR 600MW SUPERCRITICAL UNIT AT QINBEI POWER PLANT[J]. Thermal power generation, 2003, (7): 10-12. DOI: 10.19666/j.rlfd.2003.07.003.

  •  
  •  

0

Views

175

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Effect of oblique angle of turbine stator blade on flow field and energy conversion of steam in nozzle
OPERATION BEHAVIOR OF STARTUP SYSTEM FOR ONCETHROUGH BOILERS WITH BYPASS SYSTEM OF STEAM TURBINE AND SIMULATION THEREOF
MATCHING RELATIONSHIP BETWEEN TURBINE AND BOILER STEAM PARAMETERS OF SUPERCRITICAL AND ULTRASUPERCRITICAL UNITS
OPTIMIZATION OF FAST CUT BACK(FCB) CONTROL FOR THE 330 MW UNIT IN INDONESIA INDRAMAYU POWER STATION
Optimization of bypass system control strategy for 2GT+1ST combined cycle power unit

Related Author

ZHANG Aiping
ZHANG Yuanyuan
ZHANG Qi
SHAN Baolong
YANG Zhao
HAN Yang
多保林
侯书海

Related Institution

School of Energy and Power Engineering, Northeast Dianli University
CPI Shentou Power Co.,Ltd.
Dara Bay Nuclear Power Operations and Management Co.,Ltd.
Nanhai Power Plant No.1
Huaneng Weihai Power Plant
0